HOME > Planning > Planning Projects List
| PROJECT | FROM | TO |
| RTC RAPID | 4th Street Station | Meadowood Mall |
| Pyamid/McCarran Intersection Improvements | ||
| SouthEast Connector | South Meadows Pkwy | Greg St |
| Moana Lane Widening | S Virginia St | I580 Ramps |
| Southeast McCarran Widening | Mira Loma Dr | Greg St |
| Pyramid Highway/US 395 Connector EIS Study | US 395 @ Parr Blvd | La Posada Dr |
| W Plumb Ln | Ferris St | S McCarran Blvd |
| Geiger Grade Realignment | Geiger Grade @ Toll Rd | Wedge Pkwy @ County Rd 52 |
| 4th Street/Prater Way Corridor Study | Keystone Ave | East of Vista Blvd |