2025 PREVENTATIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Pavement Patching
STREET | FROM | TO | DATE |
Highland Ranch Parkway | Sun Valley Boulevard | Midnight Drive | 05/19 |
Wingfield Hills Road | Vista Boulevard | Rolling Meadows | 05/19 |
Terminal Way | Gentry Way | Plumb Lane | 05/19 |
Grove Street | Lymbery Street | Wrondel Way | 05/19 |
Los Altos Parkway | Vista Boulevard | Pyramid Way | 05/19-21 |
Galleria Parkway | Disc Drive | Los Altos Parkway | 05/19-21 |
Airway Drive | Neil Road | Longley Lane | 05/20-22 |
Neil Lane | Meadowood Mall Circle | Neil Road | 05/20-22 |
Nichols Boulevard | Victorian Avenue | N McCarran Boulevard | 05/20-22 |
Glendale Avenue | McCarran Boulevard | Railroad Crossing | 05/21-23 |
Meredith Way | Kleppe Lane | Glendale Avenue | 05/22-23 |
Hymer Avenue | 21st Street | Dead End | 05/22-23 |
Greg Parkway | Coney Island Drive | Greg Street | 05/23 |
S Rock Boulevard | Glendale Avenue | Bridge | 05/23 |
Crack Sealing (Night Work – 7: 00p.m. to 7:00 a.m.)
STREET | FROM | TO | DATE |
First Street | Keystone Avenue | Arlington Avenue | 05/18-22 |
Lund Lane | Wedekind Road | Northtowne Lane | 05/18-22 |
Galletti Way | Kietzke Lane | Railroad Crossing | 05/18-22 |
Frazer Avenue | 21st Street | Cul-de-sac | 05/18-22 |
Hymer Avenue | 21st Street | Dead End | 05/18-22 |
Pittman Avenue | 18th Street | Dead End | 05/18-22 |
Shaber Avenue | 18th Street | 15th Street | 05/18-22 |
Coney Island Drive | Greg Parkway | Dead End | 05/18-22 |
Greg Parkway | Coney Island Drive | Greg Street | 05/18-22 |
Industrial Way | Coney Island Drive | Glendale Avenue | 05/18-22 |
Dunn Circle | Glendale Avenue | Cul-de-sac | 05/18-22 |
Dunn Circle | Dunn Circle | Watson Way | 05/18-22 |
Glendale Avenue | McCarran Boulevard | Railroad Crossing | 05/18-22 |
Meredith Way | Kleppe Lane | Glendale Avenue | 05/18-22 |
Highland Ranch Parkway | Sun Valley Boulevard | Midnight Drive | 05/18-22 |
S. Wingfield Parkway | Wingfield Hills Road | Vista Boulevard | 05/18-22 |
Ryland Street | Kirman Avenue | Mill Street | 05/18-22 |
Terminal Way | Gentry Way | Plumb Lane | 05/18-22 |
Airway Drive | Neil Road | Longley Lane | 05/18-22 |
University Way | Truckee River Bridge | Maple Street | 05/18-22 |
Virginia Street | Ninth Street | PCC Roundabout | 05/18-22 |
El Rancho Boulevard | Prater Way | Oddie Boulevard | 05/18-22 |
El Rancho Drive | Clearacre Lane | Moorpark Court | 05/18-22 |
Los Altos Parkway | Vista Boulevard | Pyramid Highway | 05/18-22 |
Galleria Parkway | Disc Drive | Los Altos Parkway | 05/18-22 |
Shoppers Way | Pyramid Way | Galleria Parkway | 05/18-22 |
Wingfield Hills Road | Vista Boulevard | Rolling Meadows | 05/18-22 |
S rock Boulevard | Glendale Avenue | Bridge | 05/18-22 |
ARLINGTON AVENUE BRIDGES PROJECT – 1ST STREET TO ISLAND AVENUE
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
May 19 – May 23
West 1st Street and Arlington Avenue intersection will be closed to all traffic. Arlington Avenue will be closed between West 1st Street and Island Avenue. Northbound traffic will be detoured to the Virginia Street bridge. Southbound traffic and pedestrians will be detoured to the Sierra Street bridge.
- Starting May 12th: West Street will be open to westbound traffic only between West Street and Stevenson Street.
- Wingfield Park will remain closed from May 5, 2025, until summer 2026.
- River recreation detours will also be in place.
- View detour maps at ArlingtonBridges.com
MILL STREET CAPACITY & SAFETY
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Single lane closures on Mill Street westbound from Greg Street/Terminal Way to the I-580 southbound ramp intersection 6:00 a.m. – 5:00 p.m., Monday-Friday.
Nighttime construction will occur with single lane closures on Mill Street and some traffic signals will be flashing red, four-way stop condition.
Single lane closures on Mill Street eastbound west of Kietzke lane will occur 6:00 a.m. – 3:00 p.m.
Bus Stop Closures:
- The Route 12/14 eastbound bus stop at Mill Street/Matley Lane is closed
- The Route 14 eastbound bus stop at Mill Street/Gould Street is closed
Riders should follow signage to the nearest bus stop of call RTC customer service at (775) 348-RIDE (348-7433) for real time information.
Visit MillStreetWidening.com for information and updates
Test “MillStreet” to 866-540-8466 to sign up for construction text alerts.
STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
May 19 – May 23
- General lane restrictions in all directions to perform landscaping.
- Intermittent lane closures for landscaping.
VETERANS PARWAY ITS-LONG MEADOW DRIVE TO STEAMBOAT PARKWAY
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Single lane closures on southbound Veterans Parkway between Long Meadow Drive and Steamboat Parkway for paving operations.
TRAFFIC SIGNAL MODIFICATION 24-01
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
Friday, May 23
W 7th Street at N. McCarran Boulevard – Flagger-controlled lane closures on 7th Street to perform daytime slurry operations.
S. Virginia Street at Cheney Street – S. Virginia Street closed between St. Lawrence Avenue and W Taylor Street to perform daytime slurry operations. Vehicle and pedestrian traffic should follow detours around the closure.
MEADOWOOD MALL REHABILITATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
May 19 – May 23
Roadway work and sidewalk reconstruction to be performed on Meadowood Mall Circle between S. Virginia Street and Meadowood Mall Circle, Meadowood Mall Way between S. Virginia Street and Meadowood Mall Circle, and Neil Way between Neil Road and Meadowood Mall Circle.
Meadowood Mall Circle
- One lane each direction will be maintained during the day.
- Route 1 Bus Stop on Meadowood Mall Circle (at Jiffy Lube) will be temporarily closed.
- Jiffy Lube driveway access will be maintained at all times.
Neil Way
- One lane each direction will be maintained during the day.
Meadowood Mall Way
- One lane each direction will be maintained during the day.