2025 PREVENTATIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Micro-surfacing
STREET | FROM | TO | DATE |
Keystone Avenue | University Terrace | Coleman Drive | 7/14 |
Virginia Street | Ninth Street | Beg Pcc Rab | 7/15 |
University Way | Truckee River Bridge | Maple Street | 7/16-7/17 |
Lund Lane | Wedekind Road | Northtowne Lane | 7/17 |
Sutro Street | McCarran Boulevard | 1400′ North | 7/17 |
Evans Avenue | Jodi Drive | McCarran Boulevard | 7/18 |
Sadleir Way | Valley Road | Wells Avenue | 7/18 |
Frazer Avenue | S 21st Street | Cul De Sac | 7/19 |
Hymer Avenue | S 21st Street | Dead End | 7/19 |
Pittman Avenue | S 18th Street | Dead End | 7/19 |
Shaber Avenue | S 18th Street | S 15th Street | 7/19 |
Galletti Way | Kietzke Lane | 20ft Past N/E RR-Xing | 7/19 |
Pavement Marking (Night Work 7:00 p.m. – 7:00 a.m.)
STREET | FROM | TO | DATE |
Keystone Avenue | University Terrace | Coleman Drive | 7/14 |
Virginia Street | Ninth Street | Beg Pcc Rab | 7/15 |
University Way | Truckee River Bridge | Maple Street | 7/16 |
Lund Lane | Wedekind Road | Northtowne Lane | 7/17 |
Sutro Street | Mccarran Boulevard | 1400′ North | 7/17 |
Evans Avenue | Jodi Drive | McCarran Boulevard | 7/18 |
Sadleir Way | Valley Road | Wells Avenue | 7/18 |
Pavement Marking
STREET | FROM | TO | DATE |
First Street | Keystone Avenue | Ralston St | 7/14-7/15 |
Ryland Street | Kirman Avenue | Mill Street | 7/15-7/16 |
Mayberry Drive | Hunter Lake Drive | California Avenue | 7/16 |
California Avenue | Hunter Lake Drive | Virginia Street | 7/16-7/18 |
Vehicle Detection Loops
STREET | FROM | TO | DATE |
Evans Avenue | Jodi Drive | McCarran Boulevard | 7/15 |
Pavement Patching
STREET | FROM | TO | DATE |
University Way | Truckee River Bridge | Maple Street | 7/14-7/15 |
ARLINGTON AVENUE BRIDGES PROJECT – 1ST STREET TO ISLAND AVENUE
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
Arlington Avenue will be closed between West 1st Street and Island Avenue. Northbound traffic will be detoured to the Virginia Street Bridge or Center Street. Southbound traffic and pedestrians will be detoured to the Sierra Street Bridge.
- West Street will be open to westbound traffic only between West Street and Stevenson Street.
- Wingfield Park will remain closed from May 5, 2025, until summer 2026.
- River recreation detours will also be in place.
- View detour maps at ArlingtonBridges.com
MILL STREET CAPACITY & SAFETY
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Daytime and nighttime construction continues with some single lane closures westbound on Mill Street between I-580 and Terminal Way.
Nighttime work begins at the Kietzke Lane/Mill Street intersection.
Bus Stop Closures:
- The Route 12/14 westbound bus stop at Mill Street/Matley Lane is closed.
Riders should follow signage to the nearest bus stop of call RTC customer service at (775) 348-RIDE (348-7433) for real time information.
Visit MillStreetWidening.com for information and updates. Text “MillStreet” to 866-540-8466 to sign up for construction text alerts.
STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
July 14 – July 18
General lane restrictions in all directions to perform landscaping.
TRAFFIC SIGNAL MODIFICATION 24-01
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
July 2025
The new Rectangular Rapid Flashing Beacons (RRFB) will be installed the week of July 14th at the crosswalk on Holcomb Avenue at Cheney Street in midtown.
E. LINCOLN WAY ROUNDABOUT RECONSTRUCTION PROJECT
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
July 13 – July 18Â
Construction on E. Lincoln Way between Marina Gateway Drive and Sparks Boulevard is anticipated to continue through September.Â
- One paved travel lane in each direction will remain open through E. Lincoln Way between Sparks Boulevard and Marina Gateway Drive
- Left turn lanes from northbound Sparks Boulevard to westbound E. Lincoln Way will be reduced throughout construction.Â
- There will be limited access to/from Scheels Drive, George Ferris Drive, and north mall access through the Scheels Roundabout intermittently throughout construction. Alternate access to adjacent properties will be maintained.
- Normal working hours are 9:30 p.m. to 6:30 a.m., Sunday night through Thursday morning.
MEADOWOOD MALL REHABILITATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
July 14 – July 18
Project is substantially complete. No lane restrictions expected.
VISTA PRATER SIGNAL FIBER CONNECTION PROJECT
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Installation of traffic fiber network on Prater Way from Sparks Boulevard to Vista Boulevard and Vista Boulevard from Prater Way to Kleppe Lane.
July 14 – July 18
Prater Way
- Shoulder closures eastbound and westbound directions.
- Intermittent lane restrictions and lane reductions through intersections.
Vista Boulevard
- Shoulder closures northbound and southbound directions.
- Intermittent lane restrictions and lane reductions through intersections.
TRAFFIC SIGNAL FIBER 25-01
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Installation of traffic fiber on Vista Boulevard from Prater Way to Baring Boulevard, Longley Lane from Maestro Drive to S. McCarran Boulevard, Kietzke Lane from Fisherman’s Park to Galletti Way, and Galletti Way from Kietzke Lane to Glendale Avenue.
Vista Boulevard
Single lane closures for potholing and trenching operations.
Longley Lane
Single lane closures for potholing and trenching operations.
VISTA AND DISC INTERSECTION IMPROVEMENT PROJECT
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
Major road work at the Vista Boulevard and Disc Drive intersection in Sparks for construction of new turn lanes is expected to begin in late July or early August.
Work is substantially complete at the Nichols Drive location and Veterans Parkway/Mira Loma Drive intersection. Motorists may occasionally see crews for final cleanup work.
2025 BRIDGE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Valley Road Bridge over I-80 will be closed July 7 – July 18. Alternate routes are University Way, Evans Street, Virginia Street, Ralston Street, Washington Street, and Vine Street to the west, and Wells Avenue to the east.
ARROWCREEK PARKWAY & WEDGE PARKWAY REHABILITATION
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
July 14 – July 18
Construction operations will continue on Arrowcreek Parkway from Thomas Creek Road to the Arrowcreek Parkway/Wedge Parkway intersection. Work will include concrete removals, utility adjustments and construction of concrete improvements: curb, gutter, sidewalk, pedestrian ramps, driveways and valley gutters.
Arrowcreek Pkwy
- One-way traffic on Arrowcreek Parkway from approximately the Wedge Parkway intersection to Thomas Creek Road will be in place. Westbound/southbound traffic will be detoured to Mt. Rose Highway and S. Virginia Street via Thomas Creek Road.
- Normal working hours are from 7:00 a.m. to 6:00 p.m., Monday through Friday
VETERANS ROUNDABOUT MODIFICATIONS
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
July 14 – July 18
Work will continue on the inside lane of the roundabout and will generally include: concrete demolition, landscape removals and start of construction of concrete improvements.
- A minimum of one paved travel lane will be open in each direction
- Left turn lanes at all signalized intersections will be open
- Short traffic delays may occur during this phase of construction
- Access will be maintained to adjacent properties
- Temporary driveway closures may occur during certain construction activities; and if so, Q&D will provide notice to impacted properties 18-24 hours prior to start of work
- Normal working hours are from 7:00 a.m. to 7:00 p.m., Monday through Friday