2024 PREVENTATIVE MAINTENANCE
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.
Micro-Surfacing 7:00 a.m. – 5:00 p.m.
STREET | FROM | TO | DATE |
Los Altos Parkway | Vista Boulevard | Santa Barbara Avenue | 09/11 |
Vista Boulevard | Loop Road | Brierley Way | 9/11 |
LAS BRISAS AND LOS ALTOS RESURFACING PROJECT
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
Las Brisas Boulevard between Brittania Drive and McCarran Boulevard
- Work is substantially complete.
- Contractor will be on site to complete minor work items throughout August.
- Two-way traffic anticipated to be maintained.
Los Altos Parkway between North Vista Boulevard and Goodwin Road
- Work is substantially complete.
- Contractor will be on site to complete minor work items throughout August.
- Two-way traffic anticipated to be maintained.
SOMERSETT PARKWAY REHABILITATION (2024 CORRECTIVE MAINTENANCE)
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
September 9 – September 13
- SNC has completed Phase 1 of construction – lowering utilities in preparation of the mill and fill operation to follow.
- There will be no activity this week.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
- Project is substantially completed.
- Intermittent lane shifts for punch item list work and landscape work.
SOUTH VIRGINIA STREET SAFETY & CAPACITY PROJECT – I-580 EXIT 29 TO LONGLEY LANE (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. -(775) 335-1861
- Two lanes on each direction will remain open along South Virginia Street between 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.
- At least one lane will be open on South Virginia Street starting at 6:00 p.m. everyday until 7:00 a.m. the next day (night work).
- Crews will be working during the night until September 20, installing concrete (curb, gutter, pedestrian ramps, and driveways) on the southbound side of South Virginia and installing electrical work ( conduit, pull boxes, poles, etc.).
- Crews will also start work on the Patriot/S Virginia intersection.
STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Construction is underway and will continue through Fall 2024. Intersection paving operations are scheduled for September 9-10 at night between 7:00 p.m. to 5:00 a.m. Druing paving operations, the following traffic control restrictions will be in place. Through traffic is encouraged to use alternate routes, if possible.
September 9 – September 13
- Veterans Parkway will be closed at Carat Avenue and Rio Wrangler between 7:00 p.m. and 5:00 a.m., Monday night and Tuesday night.
- Traffic will be reduced to one lane in each direction and under flagger control at the intersection of Steamboat Parkway/Veterans Parkway.
- Northbound Veterans Parkway will be detoured via Rio Wrangler.
- Southbound Veterans Parkway will be detoured at Carat Avenue.
- Anticipate delays and use caution and slow speeds through the work zone.
KIETZKE INTELLIGENT TRAFFIC SYSTEMS (ITS) PROJECT
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Construction is underway for Kietzke ITS Project and will continue through mid October. Project limits start at the intersection of Manual Street and E 2nd Street to the intersection of E 2nd Street to Kietzke Lane. From there, the project continues in the southbound shoulder along Kietzke Lane to Mill Street.
September 9 – September 13
- Shoulder closures and lane reductions in the southbound direction on Kietzke Lane between E. 2nd Street and Mill Street.
RALEIGH HEIGHTS REHABILITATION
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
- Single lane closures and local traffic only on Yorkshire Drive and Carlyle Drive.
- Limited on-street parking.
TRAFFIC SIGNAL MODIFICATION 23-01
RTC Project Manager, Sara Going, P.E. – (775) 335–1897
September 2 – September 6
El Rancho Boulevard & G Street
- Intermittent lane closures will occur in all directions at this location as crews work o overhead signal systems and reconstruct the right turn lane from eastboud.
- Two-way travel will be maintained in all directions, but delays from reduced lanes should be expected during daytime non-peak hours.
Battle Born Way and Galletti Way
- Crews will begin work on the traffic signal system on Monday, August 20.
- Reduced lanes in eastbound direction.
- Shoulder and pedestrian access will be closed on the southeast corner of the intersection during daytime non-peak hours.
- Intermittent lane closures will occur in all directions as crew work on overhead signal systems.
- Two-way travel will be maintained in all directions, but delays from reduced lanes should be expected during daytime non-peak hours.
Los Altos Parkway and Galleria Parkway
- Intermittent lane closures will occur in all directions as crew work on overhead signal systems.
- Two-way travel will be maintained in all directions, but delays from reduced lanes should be expected during daytime non-peak hours.