PROJECT DETAILS
RTC Project No. 0247011
RTC Project Manager (PM)
Sara Going, P.E.
(775) 335-1897
RTC Engineering Department
(775) 348-0171
Design Firm:Â Westwood
Construction Contractor:Â To be determined
PROJECT DESCRIPTION
As part of RTC’s Traffic Engineering Program, Traffic Signal Modification 23-01 will implement spot improvements at 19 intersections and perform engineering evaluations for four intersections.
The project locations and scope are listed below:
Spot Improvement Locations:
1. Clearacre Lane and North McCarran Boulevard – Remove north/ south split traffic signal phasing.
2. Battle Born Way and Galletti Way – Install new signal controller cabinet and vehicle detection
system.
3. El Rancho Drive and G Street – Remove east/west split traffic signal phasing.
4. Los Altos Parkway and Galleria Parkway – Extend westbound to southbound left turn pocket.
5. Robb Drive and MaeAnne Avenue – Install new metered service with battery backup system.
6. Golden Valley Road and North Hills Boulevard – Install new metered service with battery backup system, traffic signal controller cabinet, and vehicle detection system.
7. Plumb Lane and Plumas Street – Install new metered service with battery backup system and new traffic signal controller cabinet. Modify existing vehicle detection system.
8. Ryland Street and Locust Street – Install new metered service with battery backup system and new traffic signal controller cabinet.
9. West Street and W. 4th Street – Install new traffic signal controller cabinet.
10. Sutro Street and Wedekind Road – Install new vehicle detection system.
11. South McCarran Boulevard and Greensboro Drive – Install new vehicle detection system.
12. South McCarran Boulevard and Mayberry Drive – Install new vehicle detection system.
13. West Plumb Lane and Lakeside Drive – Modify existing vehicle detection system.
14. East Plumb Lane and Kirman Avenue – Modify existing vehicle detection system.
15. Arrowcreek Parkway and Wedge Parkway – Install accessible pedestrian push buttons.
16. Mount Rose Highway and Wedge Parkway – Install battery backups system and accessible pedestrian push buttons.
17. Mount Rose Highway and Thomas Creek Road – Install battery backups system and accessible pedestrian push buttons.
18. Sun Valley Boulevard and E. 4th Avenue – Modify traffic signal heads.
19. Sun Valley Boulevard and E. 5th Avenue – Install accessible pedestrian push buttons.
Engineering Evaluations:
20. La Posada and Cordoba Boulevard – Intersection Control Evaluation
21. Nichols Boulevard and Howard Drive – Circulation Study
22. Visa Boulevard and Disc Drive – Evaluate Turn Lanes
23. Pyramid Highway and Calle De La Plata – Evaluate Turn Lanes
LATEST NEWS
The project will be advertised for construction bids in September.
SCHEDULE
Planning:Â N/A
Environmental:Â N/A
Preliminary Design:Â September 2022
Final Design:Â May 2023
Construction:Â Summer/Fall 2023
FINANCIAL INFORMATION
Total Project Estimate:Â $ 1,950,617
Funding Source:Â RTC Fuel Tax
Post updated on: August 28, 2023