LAS BRISAS AND LOS ALTOS RESURFACING

Status: Active Projects

PROJECT DETAILS
RTC Project No. 0244012

RTC Project Manager (PM)
Jessica Dover, P.E.
(775) 335-1831
jdover@rtcwashoe.com

RTC Engineering Department
(775) 348-0171

Design Firm: Eastern Sierra Engineering

Construction Contractor: Sierra Nevada Construction, Inc. (SNC)

PROJECT DESCRIPTION
This project includes corrective pavement maintenance, including a segment of mill overlay and a segment of slurry seal on both Las Brisas Boulevard and Los Altos Parkway. Additional scope includes replacement of pedestrian ramps in the areas of mill and overlay.

LATEST NEWS
Work on Las Brisas Boulevard between Robb Drive to Brittannia Drive has reached final completion; slurry (from Brittannia Drive to McCarran Boulevard) will occur in Spring/Summer 2024. Work on Los Altos Parkway between south Vista Boulevard to Goodwin Road has reached final completion; slurry (Goodwin Road to north Vista Boulevard) will occur in Summer 2024.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2023
Final Design: Summer 2023
Construction: Summer 2024

FINANCIAL INFORMATION
Total Project Estimate:
 $ 5,298,930
Funding Source: RTC Fuel Tax

Post updated on: April 23, 2024

Las Brisas and Los Altos Resurfacing Map