PROJECT DETAILS
RTC Project No. 0212079
RTC Project Manager (PM)
Judy Tortelli, P.E.
(775) 335-1824
RTC Engineering Department
(775) 348-0171
Design Firm:Â Lumos and Associates, Inc.
Construction Contractor:Â To be determined
PROJECT DESCRIPTION
The Raleigh Heights Rehabilitation project includes the following street segments located within the City of Reno:
- Yorkshire Drive from N/S Wellington Way to S/S Golden Valley Drive
- Lancaster Drive from E/S Shelley Circle to W/S Yorkshire Drive
- Carlyle Drive from E/S Shelly Circle to W/S Yorkshire Drive
Work includes roadway rehabilitation, removal and replacement of degraded curb and gutter, upgrading pedestrian ramps to be ADA compliant, installation of new catch basins to improve drainage, removal of bus stops, striping and signage improvements.
LATEST NEWS
Lumos and Associates, Inc., continues with preliminary design. Ninety percent design is scheduled to be submitted in November 2023. Construction is tentatively scheduled for March through August 2024.
SCHEDULE
Planning:Â N/A
Environmental:Â N/A
Preliminary Design: December 2022 – June 2023
Final Design: June 2023 – November 2023
Construction: March – August 2024
FINANCIAL INFORMATION
Total Project Estimate:Â $4,144,900.00
Funding Source:Â RTC Fuel Tax
Post updated on: August 25, 2023