RALEIGH HEIGHTS REHABILITATION

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 0212079

RTC Project Manager (PM)
Austin McCoy, P.E.

RTC Engineering Department
(775) 335-1824

Design Firm: Lumos and Associates, Inc.

Construction Contractor: Sierra Nevada Construction (SNC)

PROJECT DESCRIPTION
The Raleigh Heights Rehabilitation project includes the following street segments located within the City of Reno:

  • Yorkshire Drive from N/S Wellington Way to S/S Golden Valley Drive
  • Lancaster Drive from E/S Shelley Circle to W/S Yorkshire Drive
  • Carlyle Drive from E/S Shelly Circle to W/S Yorkshire Drive

Work includes roadway rehabilitation, removal and replacement of degraded curb and gutter, upgrading pedestrian ramps to be ADA compliant, installation of new catch basins to improve drainage, removal of bus stops, striping and signage improvements.

LATEST NEWS
SNC and RTC have completed major construction items. Miscellaneous construction and clean up is is scheduled to go through mid December.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: December 2022 – June 2023
Final Design: June 2023 – April 2024
Construction: Summer 2024

FINANCIAL INFORMATION
Total Project Estimate: 
$4,144,900.00
Funding Source: RTC Fuel Tax


Post updated on: November 25, 2024

Raleigh Heights Rehabilitation Project Map