TRAFFIC SIGNAL MODIFICATIONS 24-01

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 0247012

RTC Project Manager (PM)
Sara Going, P.E.
(775) 335-1897
sgoing@rtcwashoe.com

RTC Engineering Department
(775) 348-0171

Design Firm: Kimley-Horn and Associates

Construction Contractor: To be determined

PROJECT DESCRIPTION
The project is part of RTC’s Traffic Engineering Program and includes analysis and improvements to spot locations regionwide:

  • (Reno) North McCarran Boulevard and 7th Street – Evaluate traffic, bus, and pedestrian circulation and safety improvements near the intersection of McCarran Boulevard and 7th Street.
  • (Reno) South Virginia Street and Center Street – Pedestrian safety improvements at the roundabout.
  • (Reno) Vassar Street and Harvard Way – Modify intersection pavement markings to improve northbound to westbound turning movements for RTC buses.
  • (Sparks) Rock Boulevard and C Street – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) North McCarran Boulevard and York Way – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) Rock Boulevard and York Way – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) Proctor R. Hug High School Circulation Study – Review pedestrian and circulation issues surrounding the high school for short and long term improvements.
  • (Sparks) Outlets at Legends / Lincoln Way Circulation Study – Review traffic circulation and conflicts along Lincoln Way within the Outlets at Legends development.

LATEST NEWS
The project has begun preliminary design.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Summer 2023
Final Design: Winter 2023
Construction: Summer 2024

FINANCIAL INFORMATION
Total Project Estimate:
 $1,750, 000
Funding Source: RTC Fuel Tax


Post updated on: April 23, 2024

Traffic Signal Modification 24-01 Project Map