Status: Active Projects
PROJECT DETAILS
RTC Project No. 243018
RTC Project Manager (PM)
Jessica Dover, P.E.
RTC Engineering Department
(775) 348-0171
Design Firm: Lumos and Associates, Inc.
Construction Contractor: Sierra Nevada Construction, Inc. (SNC)
PROJECT DESCRIPTION
Crack sealing, patching and microsurfacing of regional roads at various locations.
2024 Preventive Maintenance list of streets
2024 Preventive Maintenance Project Map
LATEST NEWS
Construction is in progress; slurry, striping/thermo ongoing at various locations.
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: N/A
Final Design: March 2024
Construction: May 2024
FINANCIAL INFORMATION
Total Project Estimate: $7,482,440
Funding Source: RTC Fuel Tax
Post updated on: September 27, 2024