May 23, 2025

2025 PREVENTATIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Pavement Patching

STREETFROMTODATE
Highland Ranch ParkwaySun Valley BoulevardMidnight Drive05/19
Wingfield Hills RoadVista BoulevardRolling Meadows05/19
Terminal WayGentry WayPlumb Lane05/19
Grove Street Lymbery Street Wrondel Way 05/19
Los Altos Parkway Vista BoulevardPyramid Way 05/19-21
Galleria Parkway Disc DriveLos Altos Parkway 05/19-21
Airway DriveNeil RoadLongley Lane05/20-22
Neil LaneMeadowood Mall CircleNeil Road05/20-22
Nichols BoulevardVictorian Avenue N McCarran Boulevard05/20-22
Glendale Avenue McCarran Boulevard Railroad Crossing05/21-23
Meredith Way Kleppe Lane Glendale Avenue 05/22-23
Hymer Avenue 21st Street Dead End05/22-23
Greg Parkway Coney Island DriveGreg Street05/23
S Rock Boulevard Glendale Avenue Bridge05/23

Crack Sealing (Night Work – 7: 00p.m. to 7:00 a.m.)

STREETFROMTODATE
First Street Keystone Avenue Arlington Avenue 05/18-22
Lund Lane Wedekind RoadNorthtowne Lane 05/18-22
Galletti Way Kietzke Lane Railroad Crossing 05/18-22
Frazer Avenue 21st Street Cul-de-sac05/18-22
Hymer Avenue 21st Street Dead End05/18-22
Pittman Avenue 18th Street Dead End05/18-22
Shaber Avenue 18th Street 15th Street 05/18-22
Coney Island Drive Greg Parkway Dead End05/18-22
Greg ParkwayConey Island DriveGreg Street 05/18-22
Industrial Way Coney Island DriveGlendale Avenue05/18-22
Dunn Circle Glendale Avenue Cul-de-sac05/18-22
Dunn Circle Dunn Circle Watson Way 05/18-22
Glendale Avenue McCarran Boulevard Railroad Crossing05/18-22
Meredith Way Kleppe Lane Glendale Avenue 05/18-22
Highland Ranch Parkway Sun Valley BoulevardMidnight Drive05/18-22
S. Wingfield Parkway Wingfield Hills RoadVista Boulevard05/18-22
Ryland Street Kirman Avenue Mill Street 05/18-22
Terminal Way Gentry Way Plumb Lane05/18-22
Airway DriveNeil RoadLongley Lane05/18-22
University Way Truckee River BridgeMaple Street 05/18-22
Virginia Street Ninth Street PCC Roundabout05/18-22
El Rancho BoulevardPrater Way Oddie Boulevard05/18-22
El Rancho DriveClearacre LaneMoorpark Court05/18-22
Los Altos Parkway Vista BoulevardPyramid Highway 05/18-22
Galleria Parkway Disc DriveLos Altos Parkway 05/18-22
Shoppers Way Pyramid Way Galleria Parkway 05/18-22
Wingfield Hills RoadVista Boulevard Rolling Meadows05/18-22
S rock BoulevardGlendale Avenue Bridge05/18-22


ARLINGTON AVENUE BRIDGES PROJECT – 1ST STREET TO ISLAND AVENUE
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865

May 19 – May 23

West 1st Street and Arlington Avenue intersection will be closed to all traffic. Arlington Avenue will be closed between West 1st Street and Island Avenue. Northbound traffic will be detoured to the Virginia Street bridge. Southbound traffic and pedestrians will be detoured to the Sierra Street bridge.

  • Starting May 12th: West Street will be open to westbound traffic only between West Street and Stevenson Street.
  • Wingfield Park will remain closed from May 5, 2025, until summer 2026.
  • River recreation detours will also be in place.
  • View detour maps at ArlingtonBridges.com


MILL STREET CAPACITY & SAFETY
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844

Single lane closures on Mill Street westbound from Greg Street/Terminal Way to the I-580 southbound ramp intersection 6:00 a.m. – 5:00 p.m., Monday-Friday.

Nighttime construction will occur with single lane closures on Mill Street and some traffic signals will be flashing red, four-way stop condition.

Single lane closures on Mill Street eastbound west of Kietzke lane will occur 6:00 a.m. – 3:00 p.m.

Bus Stop Closures:

  • The Route 12/14 eastbound bus stop at Mill Street/Matley Lane is closed
  • The Route 14 eastbound bus stop at Mill Street/Gould Street is closed

Riders should follow signage to the nearest bus stop of call RTC customer service at (775) 348-RIDE (348-7433) for real time information.

Visit MillStreetWidening.com for information and updates

Test “MillStreet” to 866-540-8466 to sign up for construction text alerts.


STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

May 19 – May 23

  • General lane restrictions in all directions to perform landscaping.
  • Intermittent lane closures for landscaping.


VETERANS PARWAY ITS-LONG MEADOW DRIVE TO STEAMBOAT PARKWAY
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824

Single lane closures on southbound Veterans Parkway between Long Meadow Drive and Steamboat Parkway for paving operations.


TRAFFIC SIGNAL MODIFICATION 24-01
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861

Friday, May 23

W 7th Street at N. McCarran Boulevard – Flagger-controlled lane closures on 7th Street to perform daytime slurry operations.

S. Virginia Street at Cheney Street – S. Virginia Street closed between St. Lawrence Avenue and W Taylor Street to perform daytime slurry operations. Vehicle and pedestrian traffic should follow detours around the closure.


MEADOWOOD MALL REHABILITATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

May 19 – May 23

Roadway work and sidewalk reconstruction to be performed on Meadowood Mall Circle between S. Virginia Street and Meadowood Mall Circle, Meadowood Mall Way between S. Virginia Street and Meadowood Mall Circle, and Neil Way between Neil Road and Meadowood Mall Circle.

Meadowood Mall Circle

  • One lane each direction will be maintained during the day.
  • Route 1 Bus Stop on Meadowood Mall Circle (at Jiffy Lube) will be temporarily closed.
  • Jiffy Lube driveway access will be maintained at all times.

Neil Way

  • One lane each direction will be maintained during the day.

Meadowood Mall Way

  • One lane each direction will be maintained during the day.