Skip to main content

LEMMON DRIVE TRAFFIC IMPROVEMENTS AND RESILIENCY

Project Overview

Label Value
Status Upcoming Projects
Project Details 0217001
RTC Project Manager (PM) Bryan Byrne, P.E.
RTC Engineering Department (775) 335-1865
Design Firm CA Group, Inc.
Construction Contractor To be determined

Project Description

The RTC, in collaboration with regional partners, stakeholders, and the community, is leading an initiative to design and reconstruct a safer, more resilient Lemmon Drive between Fleetwood Drive and Ramsey Way. The Lemmon Drive Traffic Improvements & Resiliency Project will assess the reconstruction of the roadway above the 100-year floodplain to enhance safety, connectivity, and resilience, particularly in adverse weather conditions and emergency events.

The proposed Lemmon Drive will have two lanes of traffic, one in each direction, north of Palace Drive. Lemmon Drive between Fleetwood Drive and Patrician Drive will increase to two lanes in each direction to improve traffic operations.

Community Benefits:

  • An elevated roadway to mitigate potential flooding impacts on the transportation network while allowing reliable access by residents and emergency services during weather events
  • Enhanced multimodal access (pedestrian, bicycle, and equestrian)
  • Enhanced walkway access from Lemmon Drive to Lemmon Valley Elementary School
  • Enhance safety for the traveling public by eliminating driveway access to Lemmon Drive
  • A substantial $50 million investment into the Lemmon Valley community
  • Operational improvements from Fleetwood Drive to Palace Drive

Latest News

The project is currently in the Environmental Approval Phase. Final design is anticipated in Fall 2026, and construction could begin as early as Fall 2026.

Lemmon Drive – Alternatives (Level 1)
Lemmon Drive – Alternatives (Level 2)
Lemmon Drive – 30% Preliminary Plans

 

 

For the Latest Updates

More information is available at LemmonDriveProject.com

Schedule

Planning: N/A
Environmental: 2023-2025
Preliminary Design: 2023-2025
Final Design: 2024-2026
Construction: To be determined (based on funding)

Financial Information

Total Project Estimate: $73,465,408.19
Funding Source: RTC Fuel Tax

To bid, click here:  https://rtcwashoe.procureware.com/login 

Project Map

Project Map