NORTH VALLEYS NORTH VIRGINIA STREET CAPACITY

Project Overview

Label Value
Status Upcoming Projects
Project Details 0217010
RTC Project Manager (PM) Garrett Rodgers, P.E.
RTC Engineering Department (775) 332-2139
Design Firm DOWL
Construction Contractor To be determined

Project Description

The North Valleys North Virginia Street Capacity Project is a transformative effort to address the growing congestion along North Virginia Street, one of Reno’s key thoroughfares. As the City of Reno experiences increased population and the expansion of manufacturing employment centers in the North Valleys, there is an ongoing need for improved infrastructure.

Currently, the section of North Virginia Street from Panther Drive to Stead Boulevard is characterized by one lane in each direction, with intermittent sections featuring a center turn lane. In response to the escalating traffic demands, the Regional Transportation Commission (RTC) of Washoe County, in collaboration with the City of Reno and dedicated regional partners, is embarking on a comprehensive redesign and capacity-improvement initiative.

The RTC’s goal is to create a reconfigured, wider, and safer roadway that will include two lanes in each direction. This strategic enhancement will not only alleviate the current congestion on North Virginia Street, but is also anticipated to relieve traffic pressure on nearby U.S. 395. This project is more than just a construction effort; it is an investment in the future of our community, facilitating smoother commutes, improved safety, and enhanced connectivity.

Join the RTC in the journey to create a more accessible, efficient, and vibrant North Virginia Street, making Reno’s growth and development even more sustainable. Together, we are paving the way for a brighter transportation future.

Community Benefits:

  • Enhanced traffic flow and safety
  • Increased roadway capacity to accommodate more vehicles efficiently
  • Enriched multimodal transportation opportunities for pedestrians, bicyclists, and people on scooters
  • Enhanced safety measures at intersections
  • Improved drainage systems
  • Accessibility improvements

Public Meeting #1 Materials
Comment Period: January 16 – February 14, 2025

English

Spanish


 

Latest News

The project has reached the 30% (preliminary) design stage and the RTC is seeking community input on the design plans. Project design will continue through spring 2026. Right-of-Way acquisition is anticipated to take place between fall 2025 and spring 2026. If your property is impacted, the RTC will be reaching out to you.

Please note, construction is tentatively anticipated to begin in 2027 and will not occur at the same time as U.S. 395 improvements.

Schedule

Planning: N/A
Environmental: To be determined
Preliminary Design: Summer 2025
Final Design: Spring 2027
Construction: (Tentative 2027)

Financial Information

Total Project Estimate: $98,901,490.37
Funding Source: RTC Fuel Tax