EAST LINCOLN WAY ROUNDABOUT

Project Overview

Label Value
Status Active Projects
Project Details 247015
RTC Project Manager (PM) Ashley Hurlbut, P.E.
RTC Engineering Department (775) 335-1861
Design Firm Kimley-Horn and Associates
Construction Contractor Sierra Nevada Construction, Inc.

Project Description

The project will modify two roundabouts on East Lincoln Way in Sparks between Sparks Boulevard and Marina Gateway Drive to reduce crashes, improve lane utilization, add capacity and facilitate safer pedestrian crossings. The modifications include adding a second circulating lane to access Scheels Drive at the Lincoln Way/ Scheels Drive roundabout, improving signage and sight lines at both roundabouts and adding pedestrian flashers for multi-lane pedestrian crossings.

Latest News

Construction began July 2025 and was substantially complete by end of September 2025. Installation of a foundation for a new overhead sign structure on westbound East Lincoln Way is anticipated to start in March 2026.

Group of staffers lined up cutting the ribbon on the new roundabout

Schedule

Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2024
Final Design: Summer/Fall 2024
Construction: Summer 2025

 

Financial Information

Total Project Estimate: $3,588,985
Funding Source: RTC Fuel Tax

Project Map

Legends Roundabouts Project Map