TRAFFIC SIGNAL MODIFICATIONS 25-01
Project Overview
| Label | Value |
|---|---|
| Status | Active Projects |
| Project Details | 245010 |
| RTC Project Manager (PM) | LaShonn Ford, P.E. |
| RTC Engineering Department | (775) 332-2136 |
| Design Firm | GCW, Inc. |
| Construction Contractor | Titan Electrical Contracting, Inc. |
Project Description
Traffic signal, safety, and/or geometric improvements at the following intersections:
Robb Drive and Seventh Street near McQueen High School (In-Progress)
- Replace the static school zone signs with an overhead flashing beacon system to improve speeding compliance and safety.
- Install pedestrian ramps at the midblock crossing on Seventh Street east of Sapphire Ridge Way.
Mayberry Drive / Hunter Lake (In-Progress)
- Replace the static school zone signs with a flashing beacon system to improve speeding compliance and safety.
- Upgrade the emergency vehicle flasher for Reno Fire Station No. 5.
Greg Street / Kleppe Lane (In-Progress)
- Replace traffic signal equipment that has reached end of life.
Baring Boulevard / North Truckee Lane (In-Progress)
- Replace traffic signal poles and equipment that has reached end of life.
- Replace pedestrian ramps.
El Rancho Drive / Wedekind Road (In-Progress)
- Upgrade the northbound/southbound left-turn signal heads to allow for a flashing yellow arrow.
- Replace the pedestrian ramps on the east side of the intersection.
- Replace traffic signal equipment that has reached end of life.
Baring Boulevard / Goldy Way (Begins March 9, 2026)
- Replace traffic signal poles and equipment that have reached end of life.
- Improve lane alignment and striping.
- Replace pedestrian ramps.
US 395 / Clear Acre Lane (Start Date TBD)
- Modify the signal’s vehicle detection system to induction loops.
Robb Drive / Mae Anne Avenue (Start Date TBD)
- Modify left-turn signal phasing for southbound Robb Drive. Change the shared through/left lane to through only to allow more vehicle movements to run concurrently and improve intersection efficiency.
McCarran Boulevard / Mira Loma Drive (Start Date TBD)
- Add a right-turn signal phase to the McCarran Boulevard northbound right turn. This will improve efficiency by giving the right-turning a dedicated phase that can overlap with other non-conflicting intersection movements.
Calle de la Plata / Isidor Court / Silent Sparrow Drive (Start Date TBD)
- Add a right-turn signal phase to the Silent Sparrow Drive eastbound right-turn. This will improve efficiency by giving the right-turning a dedicated phase that can overlap with other non-conflicting intersection movements.
Latest News
Construction is set to resume Monday, March 9, 2026, as weather allows. Through out March 2026 crews will begin work at Baring Boulevard / Goldy Way and completing the school zone flashers on Robb Drive and Seventh Street.