Skip to main content

TRUCKEE RIVER SHARED USE PATH PROJECT

Project Overview

Label Value
Status Upcoming Projects
Project Details 0311002
RTC Project Manager (PM) Jeff Wilbrecht, P.E.
RTC Engineering Department (775) 348-0171
Design Firm Lumos and Associates
Construction Contractor To be determined

Project Description

This project consists of studying and developing alternatives for the continuation of the Truckee River Shared Use Path within an approximately 2,400-foot-long segment in the southern portion of the Truckee River from John Champion Memorial Park to the east side of the US 395/IR580 overpass in Reno, Nevada.

Latest News

Project is on hold.

Schedule

Planning: July 2016 to December 2017
Environmental: 2019
Preliminary Design: 2018 to 2019
Final Design: 2019 to 2020
Construction: Project construction will be coordinated with NDOT’s Spaghetti Bowl Xpress (SBX) project.

Financial Information

Total Project Estimate: $691,106
Funding Source: RTC Fuel Tax, RTC Sales Tax, Federal Transportation Alternatives (TA) Set Aside

To bid, click here: https://rtcwashoe.procureware.com/login

Project Map