VISTA BOULEVARD/DISC DRIVE INTERSECTION IMPROVEMENT

Project Overview

Label Value
Status Active Projects
Project Details 247013
RTC Project Manager (PM) Alex Wolfson, P.E., PTOE, RSP1
RTC Engineering Department (775) 335-1880
Design Firm Wood Rodgers
Construction Contractor Sierra Nevada Construction

Project Description

This project will make the following improvements at the Vista Boulevard and Disc Drive intersection:

  • Construct a southbound Vista Boulevard to westbound Disc Drive dedicated right-turn lane
  • Construct a westbound Disc Drive to southbound Vista Boulevard dedicated left-turn lane
  • Extend the eastbound Disc Drive to northbound Vista Boulevard left-turn lane

Latest News

The new lanes at the Vista Boulevard and Disc Drive intersection are now open.

Final traffic signal replacement and striping work still needs to occur. Work will be completed when temperatures are warmer and it doesn’t conflict with traffic impacts from the Sparks Boulevard project.

Schedule

Planning: N/A
Environmental: N/A
Preliminary Design: Spring/Summer 2024
Final Design: Summer/Fall 2024
Construction: Spring 2025 through 2026

Financial Information

Total Project Estimate: $2,527,819.00
Funding Source: RTC Fuel Tax