ARLINGTON AVENUE BRIDGES PROJECT

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 0212061

RTC Project Manager (PM)
Bryan Byrne, P.E.

RTC Engineering Department
(775) 348-0171

Design Firm: Jacobs Engineering Group Inc.
Construction Contractor: To be determined

PROJECT DESCRIPTION

This project consists of the replacement of the two Arlington Avenue Bridges at the Truckee River in downtown Reno. Additionally the project will look to perpetuate and where possible enhance community access to the Truckee River and Wingfield Park as well as improve the hydraulic capacity of the Truckee River during flood events. There will be some aesthetic enhancements incorporated into the bridge design. The bridges, roadway, and Wingfield Park are owned by the City of Reno.

Feasibility Study information:

Arlington Bridges Feasibility Study Report – FINAL

Arlington Bridges Feasibility Study (Appendices):  Appendix A Appendix B1 Appendix B2 Appendix B3 Appendix B4 Appendix B5 Appendix B6 Appendix B7 Appendix B8 Appendix B9 Appendix C Appendix D Appendix E1 Appendix E2 Appendix E3 Appendix E4 Appendix E5 Appendix E6 Appendix E7 Appendix E7a Appendix E7b Appendix E7c Appendix E7d Appendix E7e Appendix E8 Appendix F Appendix G

A Fact Sheet, Map of the project area, and other information are available for download below:

Fact Sheet
Map
Target Schedule
TRAction Visioning Project (City of Reno 2009)
TRAction Visioning Project (Appendices): Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H1 Appendix H2 Appendix H3 Appendix H4 Appendix I Appendix J

December 12, 2019 Public Kick-off Meeting 

Notice Handout Comment Form Presentation Display Boards Conceptual Renderings Comments Received

February 6, 2020 Stakeholder Working Group (SWG) #1
Agenda Presentation Handouts Meeting Recap Handouts with SWG Notes Transcripts Sign-In Sheet

July 15, 2020 Technical Advisory Committee Meeting (TAC) #1

Agenda Presentation Meeting Recap Transcripts

August 31, 2020 Technical Advisory Committee Meeting (TAC) #2

Presentation Score Card Qualitative Attribute Guidelines Concept Evaluation Meeting Recap   Transcripts

November 5, 2020 Stakeholder Working Group (SWG) #2

Agenda Presentation Meeting Recap Transcripts Participant List

December 15, 2020 Stakeholder Working Group (SWG) #3

Agenda Presentation Meeting Recap Transcripts Participant List

March 2021 Virtual Public Meeting (Video)

Video Script Video Script – Spanish Presentation Presentation-Spanish Postcard Survey Response FAQs Survey Response Summary

LATEST NEWS

The Project is tentatively scheduled for construction to begin May of 2025.

SCHEDULE

Planning: N/A
Environmental: December 2019 – April 2023
Preliminary Design: January 2022 – December 2022
Final Design: January 2023 – May 2024
Construction: 2025 – 2026

FINANCIAL INFORMATION

Total Project Estimate (Planning, Design, NEPA and Construction): $28,300,944

Funding Source: RTC Fuel Tax, Sales Tax, Federal

Post updated on: October 28, 2024

Arlington Avenue Bridges (Island Avenue to West 1st Street) Project Map