Status: Upcoming Projects
PROJECT DETAILS
RTC Project No. 0217001
RTC Project Manager (PM)
Bryan Byrne, P.E.
RTC Engineering Department
(775) 348-0171
Preliminary Design Firm: CA Group, Inc.
NEPA/Final Design Firm: To be determined
Construction Contractor: To be determined
PROJECT DESCRIPTION
The project includes operational improvements along Lemmon Drive from Fleetwood Drive to Ramsey Way. Elements of this project include resilience improvements to mitigate historical flooding issues.
LATEST NEWS
The project is actively advancing in completing the necessary NEPA studies. The project team is working to address public input into the design. The team is progressing into the sixty percent design phase of the project.
Lemmon Drive – Alternatives (Level 1)
Lemmon Drive – Alternatives (Level 2)
Lemmon Drive – 30% Preliminary Plans
SCHEDULE
Planning:Â N/A
Environmental:Â 2023-2025
Preliminary Design:Â 2023-2025
Final Design:Â 2024-2026
Construction:Â To be determined (based on funding)
FINANCIAL INFORMATION
Total Project Estimate: $49,200,000.00
Funding Source: RTC Fuel Tax
Post updated on: October 28, 2024