LEMMON DRIVE TRAFFIC IMPROVEMENTS AND RESILIENCY

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 0217001

RTC Project Manager (PM)
Bryan Byrne, P.E.

RTC Engineering Department
(775) 348-0171

Preliminary Design Firm: CA Group, Inc.

NEPA/Final Design Firm: To be determined

Construction Contractor: To be determined

PROJECT DESCRIPTION
The project includes operational improvements along Lemmon Drive from Fleetwood Drive to Ramsey Way. Elements of this project include resilience improvements to mitigate historical flooding issues.

LATEST NEWS
The project team is progressing toward the ninety percent design phase as feedback is incorporated and refinements are made. The NEPA studies are also being reviewed and continue to advance on schedule, supporting the overall project timeline. A public hearing meeting will be scheduled later this year, with more details to be shared as the date approaches.

Lemmon Drive – Alternatives (Level 1)
Lemmon Drive – Alternatives (Level 2)
Lemmon Drive – 30% Preliminary Plans

SCHEDULE
Planning: N/A
Environmental: 2023-2025
Preliminary Design: 2023-2025
Final Design: 2024-2026
Construction: To be determined (based on funding)

FINANCIAL INFORMATION
Total Project Estimate: $88,465,408.19
Funding Source: RTC Fuel Tax

Post updated on: October 10, 2025