Status: Upcoming Projects
PROJECT DETAILS
RTC Project No. 0217001
RTC Project Manager (PM)
Bryan Byrne, P.E.
(775) 335-1865
bbyrne@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
Preliminary Design Firm: CA Group, Inc.
NEPA/Final Design Firm: To be determined
Construction Contractor: To be determined
PROJECT DESCRIPTION
The project includes operational improvements along Lemmon Drive from Fleetwood Drive to Ramsey Way. Elements of this project include resilience improvements to mitigate historical flooding issues.
LATEST NEWS
The project is actively advancing in completing the necessary NEPA studies. The project team is working to address public input into the design.
Lemmon Drive – Alternatives (Level 1)
Lemmon Drive – Alternatives (Level 2)
Lemmon Drive – 30% Preliminary Plans
SCHEDULE
Planning: N/A
Environmental: 2023-2024
Preliminary Design: 2023-2024
Final Design: 2024-2025
Construction: To be determined (based on funding)
FINANCIAL INFORMATION
Total Project Estimate: $49,200,000.00
Funding Source: RTC Fuel Tax
Post updated on: April 23, 2024
Lemmon Drive Traffic Improvements and Resiliency Project Map