Status: Upcoming Projects
PROJECT DETAILS
RTC Project No. 0215009
RTC Project Manager (PM)
LaShonn Ford, P.E.
RTC Engineering Department
(775) 348-0171
Design Firm: Wood Rodgers, Inc.
Construction Contractor: To be determined
PROJECT DESCRIPTION
This project will identify and implement improvements to the signalized intersection at Sierra Street / 9th Street and Sierra Street and Maple Street. The goal of the improvements is to improve both the traffic operations and safety at the intersections through geometric, striping, and signal phasing changes. The project will also install overhead Rectangular Rapid Flashing Beacon (RRFB) systems and other crossing improvements at the following locations:
- Flint Street / Liberty Street
- Wedge Parkway / UNR Redfield Campus
- Mayberry Drive / Ferris Drive
LATEST NEWS
Preliminary engineering design is underway.
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2026
Final Design: Winter 2027
Construction: Spring/Summer 2027
FINANCIAL INFORMATION
Total Project Estimate: $2,900,000
Funding Source: RTC Fuel Tax
Post updated on: October 28, 2025
Sierra St / 9th St Intersection Improvement Project Map