Status: Upcoming Projects
PROJECT DETAILS
RTC Project No. 0711001
RTC Project Manager (PM)
Bryan Byrne, P.E.
(775) 335-1865
bbyrne@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
Design Firm: Jacobs Engineering Group, Inc.
Construction Contractor: To be determined
PROJECT DESCRIPTION
The project includes removal and replacement of existing bridge that was constructed in 1937.
LATEST NEWS
The design team has begun preliminary design and is working to deliver a thirty percent design plan.
SCHEDULE
Planning: N/A
Environmental: Fall 2024 – Fall 2025
Preliminary Design: May 2023 – May 2024
Final Design: June 2024 – May 2026
Construction: To be determined
FINANCIAL INFORMATION
Total Project Estimate: $33,822,128
Funding Source: Federal
- Bridge Formula Program Off-System – $3.5M (PE) and $12.5M (CON)
- Surface Transportation Block Grant (STBG) Bridge – $10.8M (CON)
Post updated on: April 23, 2024
Sierra Street Bridge Replacement Project Map