SOUTH MEADOWS TRAFFIC ENHANCEMENTS

Status: Active Projects

PROJECT DETAILS
RTC Project No. 0217003

RTC Project Manager (PM)
Austin McCoy, P.E.

RTC Engineering Department
(775) 348-0171

Design Firm: Wood Rodgers, Inc.

Construction Contractor: Sierra Nevada Construction, Inc. (SNC)

PROJECT DESCRIPTION 
The project will complete a selection of traffic enhancements as scoped in the South Meadows Parkway Multimodal Transportation Study:

  • Extension of the eastbound to northbound left turn pocket at South Meadows Parkway and Gateway Drive
  • Closing the north side sidewalk gap on South Meadows Parkway between Evergreen Street and Double Diamond Parkway
  • South Meadows Parkway fiber optic connection from Double R Boulevard to Veterans Parkway
  • Lane balance restripe on eastbound Damonte Ranch Parkway approaching the I-580 northbound on-ramp
  • Add westbound to northbound right turn pocket at Damonte Ranch Parkway and Double R Boulevard

The project will also complete Intersection Control Evaluations for:

  • South Virginia Street and Holcomb Ranch Lane
  • Rio Wrangler Parkway and McCauley Ranch Boulevard

LATEST NEWS
Construction is complete. Thank you for your patience during this project.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Fall 2022
Final Design: Summer 2023
Construction: Spring 2024

FINANCIAL INFORMATION
Total Project Estimate: $ 4,090,000.00
Funding Source: RTC Fuel Tax

Post updated on: August 29, 2024

South Meadows Traffic Enhancements Map