TRAFFIC SIGNAL MODIFICATIONS 24-01

Status: Active Projects

PROJECT DETAILS
RTC Project No. 0247012

RTC Project Manager (PM)
Ashley Hurlbut, P.E.

RTC Engineering Department
(775) 348-0171

Design Firm: Kimley-Horn and Associates

Construction Contractor: Sierra Nevada Construction, Inc.

PROJECT DESCRIPTION
The project is part of RTC’s Traffic Engineering Program and includes analysis and improvements to spot locations regionwide:

  • (Reno) North McCarran Boulevard and 7th Street – Evaluate traffic, bus, and pedestrian circulation and safety improvements near the intersection of McCarran Boulevard and 7th Street.
  • (Reno) South Virginia Street and Center Street – Pedestrian safety improvements at the roundabout.
  • (Reno) Vassar Street and Harvard Way – Modify intersection pavement markings to improve northbound to westbound turning movements for RTC buses.
  • (Sparks) Rock Boulevard and C Street – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) North McCarran Boulevard and York Way – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) Rock Boulevard and York Way – Replace traffic signal controller cabinet and install new uninterrupted power source (UPS).
  • (Sparks) Proctor R. Hug High School Circulation Study – Review pedestrian and circulation issues surrounding the high school for short and long term improvements.
  • (Sparks) Outlets at Legends / Lincoln Way Circulation Study – Review traffic circulation and conflicts along Lincoln Way within the Outlets at Legends development.

LATEST NEWS
Construction of the project was substantially completed September 2025.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Winter 2024
Final Design: Spring/Summer 2024
Construction: Summer 2025

FINANCIAL INFORMATION
Total Project Estimate:
 $3,243, 976
Funding Source: RTC Fuel Tax


Post updated on: September 30, 2025

Traffic Signal Modification 24-01 Project Map