TRAFFIC SIGNAL MODIFICATIONS 26-01
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 245011 |
| RTC Project Manager (PM) | Alex Wolfson, P.E., PTOE, RSP1 |
| RTC Engineering Department | 775-335-1880 |
| Design Firm | Wood Rodgers, Inc. |
| Construction Contractor | To be determined |
Project Description
This project will make the following improvements:
North McCarran Boulevard / York Way:
Efficiency improvements on the east and west approaches
Improve signal head visibility on McCarran southbound
Rock Boulevard / Greg Street
Convert southbound left turn to improve safety
Rock Boulevard / Commerce Street
Upgrade existing pedestrian crossing system to rapid rectangular flashing beacons (RRFBs)
Galleria Parkway / Costa Azul Drive
Improve signal head visibility on Galleria southbound
California Avenue / Plumas Street
Install dedicated left turn signals for all four intersection approaches
Kietzke Lane / Neil Road
Install RRFBs at the roundabout crosswalks
South McCarran Boulevard / Caughlin Parkway / Cashill Boulevard
Install active advanced warning system for McCarran Boulevard southbound due to limited sight distance
Latest News
The project design has reached hundred percent milestone. Right of way acquisitions are in progress. Major construction is on track for Summer 2026.