TRAFFIC SIGNAL MODIFICATIONS 26-01

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 245011

RTC Project Manager (PM)
Alex Wolfson, P.E.

RTC Engineering Department
(775) 348-0171

Design Firm: Wood Rodgers

Construction Contractor: To be determined

PROJECT DESCRIPTION
This project will make the following improvements:

North McCarran Boulevard / York Way:

  • Efficiency improvements on the east and west approaches
  • Improve signal head visibility on McCarran southbound

Rock Boulevard / Greg Street

  • Convert southbound left turn to improve safety

Rock Boulevard / Commerce Street

  • Upgrade existing pedestrian crossing system to rapid rectangular flashing beacons (RRFBs)

Galleria Parkway / Costa Azul Drive

  • Improve signal head visibility on Galleria southbound

California Avenue / Plumas Street

  • Install dedicated left turn signals for all four intersection approaches

Kietzke Lane / Neil Road

  • Install RRFBs at the roundabout crosswalks

South McCarran Boulevard / Caughlin Parkway / Cashill Boulevard

  • Install active advanced warning system for McCarran Boulevard southbound due to limited sight distance

LATEST NEWS
The project design has reached fifty percent milestone.

SCHEDULE
Planning: Fall 2024
Environmental: N/A
Preliminary Design: Winter 2024 – Spring 2025
Final Design: Summer 2025 – Winter 2025
Construction:  Spring 2026

FINANCIAL INFORMATION
Total Project Estimate: $1,731,730
Funding Source: RTC Fuel Tax

Post updated on: April 28, 2025

Traffic Signal Modifications 26-01 (Various Roads) Project Map