December 29, 2023


2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

There is no planned work for the remaining of the year. Project is substantially complete.


4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

The project is substantially complete.  Minor punch list work will be taking place off the roadway.


ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Happy New Year from the project team!

Construction work is starting on January 2, 2024.

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Construction is complete.  Minor punch item list work and landscape maintenance taking place.

Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):

  • Two-way traffic (one lane in each direction).

Phase 3 – east of US 395 Ramps to Sutro Street (Reno):

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • Lane closures.  One lane in each direction.
  • Storm drain, underground signal and light conduit installation, curb, gutter and concrete flatwork.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com


PYRAMID WAY AND NORTH MCCARRAN BOULEVARD FIBER CONNECTIVITY
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880

Resuming on January 2nd, the following overnight work will occur between 9:00 p.m. and 5:30 a.m., Sunday nights through Friday mornings.

  • Lane closures on Pyramid Way northbound between Nugget Avenue and C Street.
  • Lane closures on the Interstate 80 eastbound off-ramp to Pyramid Way.
  • Periodic closures of Victorian Avenue on the east side of the Pyramid Way intersection; a signed detour will be provided.

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1824

  • No lane or shoulder closures are planned during this reporting period.