2024 PREVENTATIVE MAINTENANCE
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.
PAVEMENT PATCHING
STREET | FROM | TO | DATE |
Dickerson Rd | Second Street | Second Street | 5/13 |
W Grove St | Lymberry Street | Harvard Way | 5/13 |
Edison Way | Rock Boulevard | Mill Street | 5/13-14 |
Wall Street | Corporate Boulevard | Financial Boulevard | 5/13-14 |
Gentry Way | Terminal Way | Neil Road | 5/14-15 |
Neil Road | McCarran Boulevard | Gentry way | 5/14-15 |
Huffaker Lane (West) | Del Monte Lane | Virginia Street | 5/14-16 |
Lakeside Drive | Evans Creek Road | Moana Lane | 5/14-16 |
Thomas Creek Road | Holcomb Lane | Foothill Road | 5/15-17 |
Grove Street | Lymberry St | Harvard Way | 5/16-17 |
Peckham Lane | Lakeside Drive | Baker Lane | 5/17 |
Holcomb Avenue | Virginia Street | Mill Street | 5/17 |
Mt Rose Street | Arlington Avenue | Virginia Street | 5/17 |
CRACK SEAL CREW # 1 (NIGHT WORK 7:00 PM – 7:00 AM)
STREET | FROM | TO | DATE |
Lakeside Drive | Evans Creek Road | Moana Lane | 5/12-16 |
Peckham Lane | Lakeside Drive | Baker Lane | 5/12-16 |
Grove Street | Lymberry Street | Wrondel Way | 5/12-16 |
Grove Street | Kietzke Lane | Harvard Way | 5/12-16 |
Mount Rose Street | Arlington Avenue | Virginia Street | 5/12-16 |
Holcomb Avenue | Virginia Street | Burns Street | 5/12-16 |
Holcomb Avenue | Liberty Street | Mill Street | 5/12-16 |
Avenida De Landa | Sharlands Avenue | Robb Street | 5/12-16 |
Mae Anne Avenue | Quail Run Road | McCarran Boulevard | 5/12-16 |
Summit Ridge Drive | Summit Ridge Court | West Fourth Street | 5/12-16 |
Summit Ridge Interchange | Summit Ridge | Right-of-Way Fence | 5/12-16 |
Stoker Avenue | Fourth Street | Seventh Street | 5/12-16 |
Dickerson Road | W/End Second Street | W/End Second Street | 5/12-16 |
Ralston Street | Second Street | Fifth Street | 5/12-16 |
Liberty Street | Center Street | Holcomb Avenue | 5/12-16 |
Evans Avenue | Second Street | Fourth Street | 5/12-16 |
Evans Avenue | Freeway Overpass | Jodi Drive | 5/12-16 |
Ninth Street | Evans Avenue | Valley Road | 5/12-16 |
Tampa Street | Timber Way | Timber Way | 5/12-16 |
Timber Way | Valley Road | Sutro Street | 5/12-16 |
Montello Street | E/End Street at Fence | Sixth Street | 5/12-16 |
Kuenzli Street | Kietzke Lane | Giroux Street | 5/12-16 |
Ormand Court | Giroux Street | End cul-de-sac | 5/12-16 |
Regency Way | Virginia Street | End of Island W of Roundabout | 5/12-16 |
Crummer Lane | E/End at Gate I-580 Right-of-Way | Virginia Street | 5/12-16 |
Huffaker Lane | Del Monte Lane | Virginia Street | 5/12-16 |
Summit Ridge Interchange | Summit Ridge | McCarran Right-of-Way Fence | 5/12-16 |
CRACK SEAL CREW #2 (NIGHT WORK 7:00 PM – 7:00 AM)
STREET | FROM | TO | DATE |
Ohm Place | Mill Street | Mill Street | 05/12-16 |
Edison Way | Rock Boulevard | Mill Street | 05/12-16 |
Wall Street | Corporate Boulevard | Financial Boulevard | 05/12-16 |
Equity Avenue | Corporate Boulevard | McCarran Boulevard | 05/12-16 |
Bennie Lane | Gardella Avenue | Parr Boulevard | 05/12-16 |
Asti Lane | Bennie Lane | Ferrari Mcleod Boulevard | 05/12-16 |
Ferrari Mcleod Boulevard | Gardella Avenue | Parr Boulevard | 05/12-16 |
Parr Circle | Parr Boulevard | Parr Boulevard | 05/12-16 |
Security Circle | Virginia Street | Virginia Street | 05/12-16 |
Echo Court | Echo Avenue | End of cul-de-sac | 05/12-16 |
Bravo Avenue | Mount McClellan Street | Mount Bismark Street | 05/12-16 |
Bravo Avenue | Mount Lola | City Limit at Albert Way | 05/12-16 |
Mount Charleston Street | Stead Boulevard | Echo Avenue | 05/12-16 |
Stead Boulevard | Silver Lake Road | Echo Avenue | 05/12-16 |
El Rancho Drive | Prater Way | N of Rab | 05/12-16 |
Sullivan Lane | Prater Way | El Rancho Boulevard | 05/12-16 |
Rock Boulevard | Victorian Avenue | McCarran Boulevard | 05/12-16 |
Victorian Avenue | Stanford Way | McCarran Boulevard | 05/12-16 |
Victorian Avenue | Pyramid Way | Stanford Way | 05/12-16 |
Vista Boulevard | Wingfield Hills | Wingfield Hills Drive | 05/12-16 |
1ST STREET REHABILITATION AND SIGNAL REPLACEMENT (VIRGINIA TO SIERRA STREET)
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Project is substantially complete but there will be some temporary traffic controls in place on occasion as the contractor addresses final cleanup and punch list items.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
Phase 1 – Pyramid Way to Sullivan Lane (Sparks):
- Construction is complete. Minor punch item list work and landscape maintenance taking place after Phase 4 (expected by mid May).
Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):
- Major construction completed.
- Intermittent one lane closures.
- Landscape, permanent striping, and punch list items.
Phase 3 – east of US 395 Ramps to Sutro Street (Reno):
- Major construction completed.
- Intermittent one lane closures.
- Landscape, permanent striping, and punch list items.
- NVE (NV Energy) installing lights (supply availability).
Phase 4 – Sutro Street to I-80 Ramps (Reno):
- Lane closures. One lane in each direction.
- Roadwork and paving between Sutro Street and 9th Street:
- Intermittent Sutro/Oddie (half intersection closures). Detours will be posted.
- One way for each direction along Oddie.
- Traffic configuration change: South side closure- Thursday April 25 until May 15 (tentative date).
For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com
SELMI DRIVE REHABILITATION PROJECT (SUTRO STREET TO CLEAR ACRE LANE RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. -(775) 335-1861
May 8 – May 31 (tentative dates)
- One-way westbound-only traffic will be allowed on Selmi Drive at all times (24/7). Detours are provided for eastbound traffic thru McCarran Boulevard.
Accesses remain open for both businesses and residential.
STANFORD WAY REHABILITATION PROJECT (GREG STREET TO GLENDALE AVENUE)
RTC Project Manager, Kim Diegle, P.E. – (775) 335-1844
- Major construction is complete and two-way traffic has been restored.
- Shoulder and lane closures may take place intermittently as construction cleanup occuurs.
- On-street parking may remain closed in some areas as construction wraps up.
PYRAMID WAY AND NORTH MCCARRAN BOULEVARD FIBER CONNECTIVITY
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
This project is substantially complete. Occasional shoulder closures may occur on Pyramid Way between Nugget Avenue and C Street for final work items.
TRAFFIC SIGNAL INSTALLATIONS 23-01
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
Moana Lane and Baker Lane/Smith Drive (Reno)
The following traffic control will be in place at the intersection of Moana Lane, Baker Lane, and Smith Drive for traffic signal installation:
- Intermittent lane and shoulder closures.
- Full closure of the Smith Drive approach will occur at times. A detour will be provided.
Prater Way and 4th Street (Sparks)
The following traffic controls will be in place until the end of April at the intersection of Prater Way and 4th Street for traffic signal replacement:
- A temporary all-way stop will be in effect at the intersection.
- Various lane and shoulder closures.
- All turning movements and driveways will remain open.
Delays are possible and motorists should consider an alternate route until the work is complete.
SPARKS INTELLIGENT CORRIDORS
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
Construction is underway and will continue through June. Motorists can expect the following traffic controls:
Baring Boulevard between Sparks Boulevard and Vista Boulevard
- Various lane and shoulder closures for fiber optic installation.
- Lane closures (if needed) will occur Monday thru Friday, 9:00 a.m. – 3:00 p.m. daily.
Vista Boulevard between Baring boulevard and Los Altos Parkway (south)
- Various shoulder closures for fiber optic installation.
Los Altos Parkway between Ion Drive and Sparks Boulevard
- Various shoulder closures for fiber optic installation
STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Construction is underway and will continue through Fall 2024. Traffic is shifted to the center of Steamboat Parkway between Veterans Parkway and Marketplace Drive.
May 13 to May 17
- Two travel lanes in each direction will be maintained on Steamboat Parkway.
- Shoulder closures for westbound and eastbound Steamboat Parkway between Marketplace Drive and Veterans Parkway.
- Shoulder closures/lane reductions at the intersection of Veterans Parkway and Steamboat Parkway.
SOUTH MEADOWS TRAFFIC ENHANCEMENTS
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
- Single lane closure on westbound Damonte Ranch Parkway between Promenade Way and Double R Boulevard, 7:00 a.m. to 7:00 p.m.
- Single lane closure on eastbound South Meadows Parkway between Double R Boulevard and Veterans Parkway near I-580
- Single lane closure on westbound South Meadows Parkway near Double Diamond Parkway