Sparks Intelligent Corridor

PROJECT DETAILS


RTC Project No. 0227004

RTC Project Manager (PM)


Alex Wolfson, P.E., PTOE, RSP1


(775) 335-1880


awolfson@rtcwashoe.com



RTC Engineering Department


(775) 348-0171

Design Firm:  Kimley-Horn and Associates

Construction Contractor:  To be determined

PROJECT DESCRIPTION


Pyramid Highway Intelligent Corridor project will provide additional information to drivers in the Spanish Springs area regarding travel delays and recommended alternate routes. The project also proposes to automatically adjust traffic signal timings based on delays resulting from incidents or construction.

In addition, the project will install traffic signal fiber at the following locations:

  • Baring Boulevard – Sparks Boulevard to Vista Boulevard
  • Vista Boulevard – Baring Boulevard to Los Altos Parkway
  • Los Altos Parkway – Sparks Boulevard to Ion Drive

LATEST NEWS


Design of the project is ongoing. Testing of software and installation of fiber is expected to occur in Fall 2023.

SCHEDULE


Planning:  N/A


Environmental: N/A


Preliminary Design: October 2022 –  June 2023


Final Design: Summer 2023 – Fall 2023


Construction: Winter 2023 – Spring 2024

FINANCIAL INFORMATION


Total Project Estimate:$1,500,000


Funding Source:  RTC Fuel Tax

Post updated on: September 29, 2023

Sparks Intelligent Corridor Project Map