PYRAMID WAY, SPARKS BOULEVARD, HIGHLAND RANCH INTERSECTION
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 0227002 |
| RTC Project Manager (PM) | Austin McCoy, P.E. |
| RTC Engineering Department | (775) 348-0171 |
| Design Firm | Parametrix. Inc. |
| Construction Contractor | To be determined |
Project Description
The improvements to the Pyramid Way and Sparks Boulevard/Highland Ranch Intersection, including converting the existing at-grade intersection into a new grade-separated interchange. This project includes intermediate design of the interchange and preliminary design of connector (new road) between Pyramid Way/Sparks and US 395.
Latest News
Preliminary design and data collection has begun. This project involves providing sixty percent level design for the Pyramid/Sparks Interchange as well as preliminary (thirty percent) design of the Connector (the new roadway from Pyramid Highway to US 395), identified as Phase 3 in the draft phasing plan of the FEIS. A packaging plan and phasing evaluation will be conducted for the overall Pyramid Highway/US 395 Connector project to better address potential funding availability for construction implementation. Traffic modeling and analysis will be utilized in a scenario approach to support the packaging and phasing effort alongside public involvement and a National Environmental Policy Act (NEPA) compatibility review.
Visit the Project Website
More information is available at PyramidHighway.com
Project Map
Project Map