PYRAMID WAY, SPARKS BOULEVARD, HIGHLAND RANCH INTERSECTION

Project Overview

Label Value
Status Upcoming Projects
Project Details 0227002
RTC Project Manager (PM) Austin McCoy, P.E.
RTC Engineering Department (775) 348-0171
Design Firm Parametrix. Inc.
Construction Contractor To be determined

Project Description

The improvements to the Pyramid Way and Sparks Boulevard/Highland Ranch Intersection, including converting the existing at-grade intersection into a new grade-separated interchange. This project includes intermediate design of the interchange and preliminary design of connector (new road) between Pyramid Way/Sparks and US 395.

Latest News

Preliminary design and data collection has begun. This project involves providing sixty percent level design for the Pyramid/Sparks Interchange as well as preliminary (thirty percent) design of the Connector (the new roadway from Pyramid Highway to US 395), identified as Phase 3 in the draft phasing plan of the FEIS. A packaging plan and phasing evaluation will be conducted for the overall Pyramid Highway/US 395 Connector project to better address potential funding availability for construction implementation. Traffic modeling and analysis will be utilized in a scenario approach to support the packaging and phasing effort alongside public involvement and a National Environmental Policy Act (NEPA) compatibility review.

Visit the Project Website

More information is available at PyramidHighway.com

Schedule

Planning: N/A
Environmental: NEPA FEIS Complete 2018
Preliminary Design: 2024
Final Design: 2025 – 2026
Construction: N/A

Financial Information

Total Project Estimate: $164,913,723.98
Funding Source: Federal

To bid, click here:  https://rtcwashoe.procureware.com/login 