May 31, 2024


2024 PREVENTATIVE MAINTENANCE
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Pavement Patching

StreetFromToDate
Avenida De LandaSharlands AvenueRobb Drive6/3-5
Sugar Pine CourtCul-de-sacWoodland Avenue6/3-5
Woodland AvenueSugar Pine CourtFourth Street6/3-5
Mae Anne Avenue McCarran BoulevardQuail Run Road6/6

Crack Seal

StreetFromToDate
Dickerson RoadSecond StreetSecond Street6/3-7
Ralston StreetSecond StreetFifth Street6/3-7
Evans AvenueSecond StreetFourth Street6/3-7
Evans AvenueFreeway OverpassJodi Drive6/3-7
Ninth StreetEvans AvenueValley Road6/3-7
Timber WayValley RoadSutro Street6/3-7
Liberty StreetCenter StreetHolcomb Avenue6/3-7
Montello StreetEnd Street @ FenceSixth Street6/3-7
Holcomb AvenueVirginia StreetBurns Street6/3-7
Holcomb AvenueLiberty StreetMill Street6/3-7
Stoker AvenueFourth StreetSeventh Street6/3-7
El Rancho BoulevardPrater WayRoundabout 6/3-7
Sullivan LanePrater WayEl Rancho Boulevard6/3-7
Rock BoulevardVictorian AvenueMcCarran Boulevard6/3-7

Micro-Surfacing

StreetFromToDate
Huffaker LaneDel Monte LaneVirginia Street6/3
Lakeside DriveEvans Creek RoadMoana Lane6/4-5
Peckham LaneLakeside DriveBaker Lane6/6
Crummer LaneI-580Virginia Street6/6
Regency WayVirginia StreetRoundabout6/7
Gentry WayBrinkby AvenueChris Lane6/7

Pavement Striping 7:00 p.m. – 7:00 a.m.

StreetFromToDate
Huffaker LaneDel Monte LaneVirginia Street6/3
Lakeside DriveEvans Creek RoadMoana Lane6/4-5
Peckham LaneLakeside DriveBaker Lane6/6
Crummer LaneI-580Virginia Street6/6
Regency WayVirginia StreetRoundabout6/7
Gentry Way Brinkby Avenue Chris Way6/7

1ST STREET REHABILITATION AND SIGNAL REPLACEMENT (VIRGINIA TO SIERRA STREET)
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Project is substantially complete but there will be some temporary traffic controls in place for final cleanup and punch list items.


ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Expect minor lane shifts for punch item list work and landscape work.

Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):

  • Expect minor lane shifts for punch item list work and landscape work.

Phase 3 – east of US 395 Ramps to Sutro Street (Reno):

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • Expect minor lane shifts for raising utilities, final concrete and driveway work, landscaping, punch item list work, and NVE light installs.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com


SELMI DRIVE REHABILITATION PROJECT (SUTRO STREET TO CLEAR ACRE LANE RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. -(775) 335-1861

May 28 – June 7

  • No lane closures but may have various shoulder closures for concrete repair work.
  • All traffic lanes are open in both directions.


STANFORD WAY REHABILITATION PROJECT (GREG STREET TO GLENDALE AVENUE)
RTC Project Manager, Kim Diegle, P.E. – (775) 335-1844

This project is substantially complete.


TRAFFIC SIGNAL INSTALLATIONS 23-01
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880

Moana Lane and Baker Lane/Smith Drive (Reno)

The following traffic control will be in place at the intersection of Moana Lane, Baker Lane, and Smith Drive for traffic signal installation:

  • Intermittent lane and shoulder closures.
  • Full closure of the Smith Drive approach will occur at times. A detour will be provided.
  • Full closure of the Baker Lane approach will also occur due to an adjacent project. Follow the signed detour.

Prater Way and 4th Street (Sparks)

The following traffic control will be in place until the end of May at the intersection of Prater Way and 4th Street for traffic signal replacement:

  • Various lane and shoulder closures.
  • All turning movements and driveways will remain open.

SPARKS INTELLIGENT CORRIDORS
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880

Construction is underway and will continue through June. Motorists can expect the following traffic controls:

Baring Boulevard between Sparks Boulevard and Vista Boulevard

  • Various lane and shoulder closures for fiber optic installation.
  • Lane closures (if needed) will occur Monday thru Friday, 9:00 a.m. – 3:00 p.m. daily.

Vista Boulevard between Baring boulevard and Los Altos Parkway (south)

  • Various shoulder closures for fiber optic installation.

Los Altos Parkway between Ion Drive and Sparks Boulevard

  • Various shoulder closures for fiber optic installation
  • Intermittent closure of the Table Mountain Way approach to Sparks Boulevard. A signed detour will be provided for any closures.

STEAMBOAT PARKWAY IMPROVEMENT PROJECT – DAMONTE RANCH PARKWAY TO VETERANS PARKWAY
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

Construction is underway and will continue through Fall 2024. Traffic is shifted to the center of Steamboat Parkway between Veterans Parkway and Marketplace Drive.

June 3 to June 7

  • Two travel lanes in each direction will be maintained on Steamboat Parkway.
  • Shoulder closures for westbound and eastbound Steamboat Parkway between Marketplace Drive and Veterans Parkway.
  • Shoulder closures/lane reductions at the intersection of Veterans Parkway and Steamboat Parkway.

SOUTH MEADOWS TRAFFIC ENHANCEMENTS
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824

  • Single lane closure on westbound Damonte Ranch Parkway between Promenade Way and Double R Boulevard, 7:00 a.m. to 7:00 p.m.
  • Single lane closure on eastbound South Meadows Parkway between Double R Boulevard and Veterans Parkway near I-580

NORTH VIRGINIA UNIVERSITY REHABILITATION – LAWLOR ROUNDABOUT TO NORTH MCCARRAN BOULEVARD
RTC Project Manager, Bryan Byrne, P.E. – (775) 3351865

Construction is expected to begin May 28.

May 28 to June 11

  • One travel lane in each direction will be maintained on Virginia Street.
  • Shoulder closures for southbound and northbound traffic through project limits.
  • No on-street parking.