2025 PREVENTATIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Micro-surfacing
STREET | FROM | TO | DATE |
Damonte Ranch Parkway | N/S Steamboat Parkway | S/S Steamboat Parkway | 08/02 |
Pavement Marking (night work 7:00 p.m. – 7:00 a.m.)
STREET | FROM | TO | DATE |
Damonte Ranch Parkway | N/S Steamboat Parkway | S/S Steamboat Parkway | 08/02 |
Pavement Marking
STREET | FROM | TO | DATE |
Frazer Avenue | S 21st Street | Cul-de-sac | 08/04 |
Hymer Avenue | E S 21st Street | Dead End | 08/04 |
Pittman Avenue | S 18th Street | Dead End | 08/04 |
Shaber Avenue | S 18th Street | S 15th Street | 08/04 |
El Rancho Boulevard | N/E G Street | Oddie Boulevard | 08/04-05 |
El Rancho Drive | Clear Acre Lane | Moorpark Court | 08/04-05 |
Dandini Boulevard | Clear Acre Lane | Leonesio Drive | 08/05 |
Armstrong Lane | Susileen Drive | Yuma Lane | 08/07 |
Yuma Lane | Koldewey Drive | Hunter Lake Drive | 08/07 |
South Verdi Road | Verdi Court | Bridge Street | 08/07 |
Eastlake Boulevard | Cattleguard | Cattleguard | 08/07 |
Toll Road | Geiger Grade Road | Bridge Street | 08/07 |
Capital Boulevard | Rock Boulevard | S McCarran Boulevard | 08/07 |
Echo Avenue | Echo Court | Moya Boulevard | 08/08 |
Echo Avenue | Mt. Bismark Street | Mt. Limbo Street | 08/08 |
Silver Lake Road | Red Rock Road | Silver Shores Drive | 08/08 |
Newport Lane | Link Lane | S McDaniel Street | 08/08 |
ARLINGTON AVENUE BRIDGES PROJECT – 1ST STREET TO ISLAND AVENUE
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
Arlington Avenue will be closed between West 1st Street and Island Avenue. Northbound traffic will be detoured to the Virginia Street Bridge or Center Street. Southbound traffic and pedestrians will be detoured to the Sierra Street Bridge.
- West Street will be open to westbound traffic only between West Street and Stevenson Street.
- Wingfield Park will remain closed from May 5, 2025, until summer 2026.
- River recreation detours will also be in place.
- View detour maps at ArlingtonBridges.com
MILL STREET CAPACITY & SAFETY
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Construction on Mill Street will temporarily shut down during Hot August Nights, August 1 to August 10. Beginning Sunday night, August 10, construction will continue during both night and day shifts. Morning crews work from 6:00 a.m. to 5:00 p.m. and night crews begin at 7:00 p.m., Sunday night to Friday night. Drivers will see single lane closures and some traffic signals will be flashing red, four-way stop condition during night work.
Look Ahead
Matley Lane at Mill Street will be closed for 14 days beginning on Sunday night, August 10. During this closure, traffic will not be permitted to exit or enter Matley lane from Mill Street. All traffic will be directed to use Vassar Street to access Mately Lane through detour signage. Traffic exiting businesses along Matley Lane will be directed toward Vassar Street. The closure is needed to complete the permanenet configuration and new design of Mill Street.
Bus Stop Closures:
- None this week
In the event of a closure, riders should follow signage to the nearest bus stop of call RTC customer service at (775) 348-RIDE (348-7433) for real time information.
Visit MillStreetWidening.com for information and updates. Text “MillStreet” to 866-540-8466 to sign up for construction text alerts.
TRAFFIC SIGNAL MODIFICATION 24-01
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
August
The new Rectangular Rapid Flashing Beacons (RRFB) will be installed at the crosswalk on Holcomb Avenue at Cheney Street in midtown.
E. LINCOLN WAY ROUNDABOUT RECONSTRUCTION PROJECT
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
August
Construction on E. Lincoln Way between Marina Gateway Drive and Sparks Boulevard is anticipated to continue through September.
- Normal working hours are 9:30 p.m. to 6:30 a.m., Sunday night through Thursday morning.
- Scheels roundabout will be fully closed during night-time working hours.
- One paved travel lane in each direction will remain open through E. Lincoln Way between Sparks Boulevard and Marina Gateway Drive during the day.
- there will be limited access to/from Scheels Drive, George Ferris Drive, and north mall access through the Scheels roundabout intermittently during the day throughout construction. Alternate access to adjacent properties will be maintained.
- Left turn lanes from northbound Sparks Boulevard to westbound E. Lincoln Way will be reduced throughout construction.
- Vehicles and pedestrians should follow posted detours.
MEADOWOOD MALL REHABILITATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
August 4 – August 8
Project is substantially complete. No lane restrictions expected.
VISTA PRATER SIGNAL FIBER CONNECTION PROJECT
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Installation of traffic fiber network on Prater Way from Sparks Boulevard to Vista Boulevard and Vista Boulevard from Prater Way to Kleppe Lane.
August 4 – August 8
Prater Way
- Shoulder closures eastbound and westbound directions.
- Intermittent lane restrictions and lane reductions through intersections.
Vista Boulevard
- Shoulder closures northbound and southbound directions.
- Intermittent lane restrictions and lane reductions through intersections.
TRAFFIC SIGNAL FIBER 25-01
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Installation of traffic fiber on Vista Boulevard from Prater Way to Baring Boulevard, Longley Lane from Maestro Drive to S. McCarran Boulevard, Kietzke Lane from Fisherman’s Park to Galletti Way, and Galletti Way from Kietzke Lane to Glendale Avenue.
Vista Boulevard
Single lane closures for potholing and trenching operations.
Longley Lane
Single lane closures for potholing and trenching operations.
Kietzke Lane & Galletti Way
Single lane closures for potholing and trenching operations.
VISTA AND DISC INTERSECTION IMPROVEMENT PROJECT
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
Motorists can expect the following restrictions as crews relocate utilities:
- Periodic closures of the right lane on Vista Boulevard southbound approaching the Disc Drive intersection. Lane closures will generally occur between 8:00 a.m. and 3:00 p.m.
- Sidewalk closure on the west side of Vista Boulevard at the same location.
- Access to the shopping center will remain open.
2025 BRIDGE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Evans Street Bridge over I-80 will be closed August 4 to August 8. Alternate bridge routes are, Virginia Street, Ralston Street, Washington Street, and Vine Street to the west, and Valley Road and Wells Avenue to the east.
ARROWCREEK PARKWAY & WEDGE PARKWAY REHABILITATION
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
August 4 – August 15
Paving operations will start on Arrowcreek Parkways from Thomas Creek Road to approximately the west side of the Arrowcreek Parkway/Wedge Parkway intersection.
Arrowcreek Pkwy
- A full closure on Arrowcreek Pkwy, from approximately the west side of the Wedge Pkwy/Arrowcreek Pkwy intersection to the east side of the Thomas Creek Rd/Arrowcreek Pkwy intersection, will be in place through paving operations. Traffic will be detoured to Mt Rose Hwy and S. Virginia St via Thomas Creek Rd.
- Normal working hours are from 7:00 a.m. to 6:00 p.m., Monday through Friday
- Work is tentatively scheduled to occur on Saturday, 08/02/2025 and 08/09/2025
Wedge Pkwy
- Construction of concrete improvements will continue on Wedge Parkway next week; pending final permit approvals; two-way traffic will be maintained with intermittent closures:
- Demo work will be performed on the median island/curb
- Curb, gutter, sidewalk and pedestrian ramps improvements will be constructed in the northbound lane.
- Utility adjustments will occur between Golden Gate Drive and Mt. Rose Highway.
VETERANS ROUNDABOUT MODIFICATIONS
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
August 4 – August 8
No work is scheduled during the week of August 4 due to the Hot August Nights Special Event. Work will resume on August 11. traffic controls will remain in place throughout the week; vehicles and pedestrians should follow posted detours and exercise caution through the work zone.