PROJECT DETAILS
RTC Project No. 0711001
RTC Project Manager (PM)
Bryan Byrne
(775) 335-1865
RTC Engineering Department
(775) 348-0171
Design Firm:Â Jacobs Engineering Group, Inc.
Construction Contractor:Â To be determined
PROJECT DESCRIPTION
Project includes removal and replacement of existing bridge that was constructed in 1937.
LATEST NEWS
RTC has initiated the data collection and required permitting processes to commence the preliminary design phase for the Sierra Street Bridge Replacement project with the assistance of Jacobs Engineering Group, Inc.
SCHEDULE
Planning:Â N/A
Environmental: Fall 2024 – Fall 2025
Preliminary Design: May 2023 – May 2024
Final Design: June 2024 – May 2026
Construction:Â To be determined
FINANCIAL INFORMATION
Total Project Estimate:Â $33,822,128
Funding Source:Â Federal
- Bridge Formula Program Off-System – $3.5M (PE) and $12.5M (CON)
- Surface Transportation Block Grant (STBG) Bridge – $10.8M (CON)
Post updated on: September 29, 2023