PROJECT DETAILS
RTC Project No. 0311002
RTC Project Manager (PM)
Scott Gibson, P.E.
(775) 335-1874
RTC Engineering Department
(775) 348-0171
Design Firm: Lumos and Associates
Construction Contractor: To be determined
PROJECT DESCRIPTION
This project consists of studying and developing alternatives for the continuation of the Truckee River Shared Use Path within an approximately 2,400-foot-long segment in the southern portion of the Truckee River from John Champion Memorial Park to the east side of the US 395/IR580 overpass in Reno, Nevada.
LATEST NEWS
Project is on hold.
SCHEDULE
Planning: July 2016 to December 2017
Environmental: 2019
Preliminary Design: 2018 to 2019
Final Design: 2019 to 2020
Construction: Project construction will be coordinated with NDOT’s Spaghetti Bowl Xpress (SBX) project.
FINANCIAL INFORMATION
Total Project Estimate: $691,106
Funding Source: RTC Fuel Tax, RTC Sales Tax, Federal Transportation Alternatives (TA) Set Aside
Post updated on: September 29, 2023