2026 PREVENTIVE MAINTENANCE PROGRAM
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 0243022 |
| RTC Project Manager (PM) | Jessica Dover, P.E. |
| RTC Engineering Department | (775) 335-1831 |
| Design Firm | Lumos & Associates, Inc. |
| Construction Contractor | To be determined |
Project Description
This project will be doing crack sealing, patching and microsurfacing of regional roads, at various locations.
Latest News
Construction started in April 2026. Patching, slurry and striping are underway on various Regional Roadways, including Red Rock Road, Veterans Pkwy, El Rancho Drive and Los Altos Pkwy. Crack seal only work will start at the end of June 2026.