2026 PREVENTIVE MAINTENANCE PROGRAM

Project Overview

Label Value
Status Upcoming Projects
Project Details 0243022
RTC Project Manager (PM) Jessica Dover, P.E.
RTC Engineering Department (775) 335-1831
Design Firm Lumos & Associates, Inc.
Construction Contractor To be determined

Project Description

This project will be doing crack sealing, patching and microsurfacing of regional roads, at various locations.

Latest News

Construction started in April 2026. Patching, slurry and striping are underway on various Regional Roadways, including Red Rock Road, Veterans Pkwy, El Rancho Drive and Los Altos Pkwy. Crack seal only work will start at the end of June 2026.

Schedule

Planning: N/A
Preliminary Design: N/A
Final Design: Winter2025/Spring 2026
Construction: Spring 2026

Financial Information

Total Project Estimate: $8,562,742
Funding Source: RTC Fuel Tax