2026 PREVENTIVE MAINTENANCE PROJECT
Project Overview
| Label | Value |
|---|---|
| Status | Active Projects |
| Project Details | 0243022 |
| RTC Project Manager (PM) | Jessica Dover, P.E. |
| RTC Engineering Department | (775) 335-1831 |
| Design Firm | Lumos & Associates, Inc. |
| Construction Contractor | Sierra Nevada Construction, Inc. (SNC) |
Project Description
This project will be doing crack sealing, patching and microsurfacing of regional roads, at various locations.
Latest News
Construction started in April 2026. Slurry and striping are underway on various Regional Roadways. A portion of South Meadows Parkway, from Gateway Drive to Double Diamond Pkwy, is tentatively scheduled to receive preventive maintenance treatment in September 2026.