Skip to main content

PYRAMID HIGHWAY OPERATIONS IMPROVEMENTS

Project Overview

Label Value
Status Active Projects
Project Details 0237002
RTC Project Manager (PM) Jessica Dover, P.E.
RTC Engineering Department (775) 335-1831
Design Firm Atkins North America Inc.
Construction Contractor Q&D Construction

Project Description

RTC’s Pyramid Hwy Operations Improvements Project is underway.  This Project will construct an additional southbound through lane along SR 445 from Ingenuity Ave to Egyptian Dr, upgrade the traffic signal system at the Calle De La Plata intersection, install a new signal at the Ingenuity Ave intersection, and perform utility adjustments, grading and drainage improvements as necessary.

Construction is anticipated to continue through Spring 2027.

Project exhibit for the Pyramid Highway Operations Improvements Project from Ingenuity Avenue to Egyptian Drive. The graphic shows an aerial view of the approximately two-mile Pyramid Highway corridor with detailed callouts of proposed intersection improvements at Calle de la Plata and at Ingenuity Avenue/Horizon View. Improvements include adding a southbound travel lane, upgrading pedestrian ramps and traffic signals, installing a new traffic signal at Ingenuity Avenue, drainage and utility improvements, and fiber optic traffic signal connections. Construction is scheduled to begin in summer 2026 and be completed in spring 2027. Estimated project cost is $13.2 million, funded by RTC Fuel Tax.

Latest News

Work will continue on the west side of Pyramid south of Calle De La Plata to construct the barrier rail and replace the multi-use path. Roadway excavation will continue into early November 2026.

Schedule

Planning: N/A
Environmental: N/A
Preliminary Design: Summer 2025
Final Design: Winter 2025
Construction: Spring 2026

Financial Information

Total Project Estimate: 13,383,886.82
Funding Source: RTC Fuel Tax

To bid, click here:  https://rtcwashoe.procureware.com/login 

Project Map

Project Map