SUN VALLEY BOULEVARD CORRIDOR IMPROVEMENTS – PHASE 2

Project Overview

Label Value
Status Upcoming Projects
Project Details 0221002
RTC Project Manager (PM) Jessica Dover,P.E.
RTC Engineering Department (775) 335-1831
Design Firm Nichols Consulting Engineers (NCE)
Construction Contractor To be determined

Project Description

The Project will construct improvements along Clear Acre Lane/Sun Valley Boulevard from Scottsdale Road to 7th Avenue to improve safety, accessibility, drainage, and long-term corridor resilience. Improvements include drainage system improvements; shared-use paths and sidewalk; pedestrian crossings and accessibility enhancements, including transit stop upgrades and Rectangular Rapid Flashing Beacons (RRFBs) and crossings at select locations; operational improvements such as new medians, traffic signal improvements, fiber optic installation, and driveway access modifications; as well as utility adjustments and pavement improvements.

Latest News

The team is progressing to ninety percent design and is anticipated for Winter 2026.

Visit the Project Website

More information is available at SunValleyBlvdImprovements.com

Schedule

Planning: N/A
Environmental: N/A
Preliminary Design: Summer 2025
Final Design: Fall 2026
Construction: Summer 2027

Financial Information

Total Project Estimate: $88,150,000
Funding Source: RTC Fuel Tax

To bid, click here:  https://rtcwashoe.procureware.com/login 