SUN VALLEY BOULEVARD CORRIDOR IMPROVEMENTS – PHASE 2
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 0221002 |
| RTC Project Manager (PM) | Jessica Dover,P.E. |
| RTC Engineering Department | (775) 335-1831 |
| Design Firm | Nichols Consulting Engineers (NCE) |
| Construction Contractor | To be determined |
Project Description
The Project will construct improvements along Clear Acre Lane/Sun Valley Boulevard from Scottsdale Road to 7th Avenue to improve safety, accessibility, drainage, and long-term corridor resilience. Improvements include drainage system improvements; shared-use paths and sidewalk; pedestrian crossings and accessibility enhancements, including transit stop upgrades and Rectangular Rapid Flashing Beacons (RRFBs) and crossings at select locations; operational improvements such as new medians, traffic signal improvements, fiber optic installation, and driveway access modifications; as well as utility adjustments and pavement improvements.
Latest News
The team is progressing to ninety percent design and is anticipated for Winter 2026.
Visit the Project Website
More information is available at SunValleyBlvdImprovements.com