TE SPOT IMPROVEMENTS 26-01
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 0215008 |
| RTC Project Manager (PM) | Ashley Hurlbut, P.E. |
| RTC Engineering Department | (775) 335-1861 |
| Design Firm | CA Group, Inc. |
| Construction Contractor | To be determined |
Project Description
The project scope includes design and construction improvements along the following Intersections:
South Virginia Street at Kietzke Lane
- Lengthen southbound to westbound left-hand turn lane on Virginia Street
- Restripe the eastbound to northbound left-turn lane on Kietzke Lane for dual left turns
McCarran Boulevard and Mira Loma Drive
- Widen Mira Loma Drive on the north side to allow dual westbound to southbound left turns
- Enhance bicycle and pedestrian movement through the intersection with a multiuse path
- Construct crosswalk with flashing beacons on Mira Loma Drive near Parkview Apartments
- Construct new Mira Loma park entrance on McCarran Boulevard
McCarran Boulevard and Evans Avenue
- Restripe Evans Avenue to allow dual northbound to westbound left turns
Latest News
The CA Group, Inc. is advancing intermediate design for the project.
Construction is expected to start early 2027.
Project Map
Project Map