Project Overview

Label Value
Status Upcoming Projects
Project Details 0215008
RTC Project Manager (PM) Ashley Hurlbut, P.E.
RTC Engineering Department (775) 335-1861
Design Firm CA Group, Inc.
Construction Contractor To be determined

Project Description

The project scope includes design and construction improvements along the following Intersections:

  1. South Virginia Street at Kietzke Lane
  2. McCarran Boulevard and Mira Loma Drive
  3. McCarran Boulevard and Evans Avenue

Latest News

The CA Group, Inc. is advancing intermediate design for the project.

South Virginia Street and Kietzke Lane
» Lengthen southbound to westbound left-hand tun lane on Virginia Street
» Restripe the eastbound to northbound left turn lane on Kietzke Lane for dual left turns
McCarran Boulevard and Mira Loma Drive
» Widen Mira Loma Drive on the north side to allow dual westbound to southbound left turns
» Enhance bicycle and pedestrian movement through the intersection with a multiuse path
» Construct crosswalk with flashing beacons on Mira Loma Drive near the Parkview Apartments
» Construct new Mira Loma park entrance on McCarran Blvd
N McCarran Boulevard and Evans Avenue
» Restripe Evans Avenue to allow dual northbound to westbound left turns

Construction is expected to start 2026/2027.

Schedule

Planning: N/A
Environmental: N/A
Preliminary Design: Fall 2025
Final Design: Summer 2026
Construction: 2026/2027

Financial Information

Total Project Estimate: $ 3,691,850.00
Funding Source: RTC Fuel Tax