TE SPOT IMPROVEMENTS 26-01
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 0215008 |
| RTC Project Manager (PM) | Ashley Hurlbut, P.E. |
| RTC Engineering Department | (775) 335-1861 |
| Design Firm | CA Group, Inc. |
| Construction Contractor | To be determined |
Project Description
The project scope includes design and construction improvements along the following Intersections:
- South Virginia Street at Kietzke Lane
- McCarran Boulevard and Mira Loma Drive
- McCarran Boulevard and Evans Avenue
Latest News
The CA Group, Inc. is advancing intermediate design for the project.
South Virginia Street and Kietzke Lane
» Lengthen southbound to westbound left-hand tun lane on Virginia Street
» Restripe the eastbound to northbound left turn lane on Kietzke Lane for dual left turns
McCarran Boulevard and Mira Loma Drive
» Widen Mira Loma Drive on the north side to allow dual westbound to southbound left turns
» Enhance bicycle and pedestrian movement through the intersection with a multiuse path
» Construct crosswalk with flashing beacons on Mira Loma Drive near the Parkview Apartments
» Construct new Mira Loma park entrance on McCarran Blvd
N McCarran Boulevard and Evans Avenue
» Restripe Evans Avenue to allow dual northbound to westbound left turns
Construction is expected to start 2026/2027.
Project Map
Project Map