TRAFFIC SIGNAL MODIFICATIONS 26-01
Project Overview
| Label | Value |
|---|---|
| Status | Upcoming Projects |
| Project Details | 245011 |
| RTC Project Manager (PM) | Alex Wolfson, P.E., PTOE, RSP1 |
| RTC Engineering Department | 775-335-1880 |
| Design Firm | Wood Rodgers, Inc. |
| Construction Contractor | To be determined |
Project Description
This project will make the following improvements:
North McCarran Boulevard / York Way:
Efficiency improvements on the east and west approaches
Improve signal head visibility on McCarran southbound
Rock Boulevard / Greg Street
Convert southbound left turn to improve safety
Rock Boulevard / Commerce Street
Upgrade existing pedestrian crossing system to rapid rectangular flashing beacons (RRFBs)
Galleria Parkway / Costa Azul Drive
Improve signal head visibility on Galleria southbound
California Avenue / Plumas Street
Install dedicated left turn signals for all four intersection approaches
Kietzke Lane / Neil Road
Install RRFBs at the roundabout crosswalks
South McCarran Boulevard / Caughlin Parkway / Cashill Boulevard
Install active advanced warning system for McCarran Boulevard southbound due to limited sight distance
Latest News
Construction will begin in late September 2026 and early October 2026.