2026 PREVENTATIVE MAINTENANCE PROGRAM
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
Microsurfacing (Night Work 7:00 p.m. – 7:00 a.m.)
| STREET | FROM | TO | DATE |
| Market Street | N/S Villanova Drive | E/S Kietzke Lane | 7/12 |
| Yale Way | E/S Harvard Way | W/S Market Street | 7/12 |
| Louise Street | N/S Market Street | S/S Mill Street | 7/12 |
| Automotive Way | E/S Kietzke Lane | W/S Market Street | 7/13 |
| Bible Way | N/S Vassar Street | S/S Mill Street | 7/13 |
| Condor Way | W End of Street | W/S Airmotive Way | 7/13 |
| Telegraph Street | N/S Vassar Street | S/S Greg Street | 7/14 |
| Matley Lane | N/S Vassar Street | S/S Mill Street | 7/14 |
| Marietta Way | End of Pavement | Greg Street | 7/15 |
| Glen Carran Circle | S Stanford Way (S) | S Stanford Way (N) | 7/15 |
| S Stanford Way | Nugget Avenue | Railroad | 7/15 |
| Pacific Avenue | S 21st Street | S 19th Street | 7/16 |
| S 21st Street | Greg Street | Pacific Avenue | 7/16 |
Pavement Striping (Night Work 7:00 p.m. – 7:00 a.m.)
| STREET | FROM | TO | DATE |
| Ninth Street | E/S Wells Avenue | City Limits E of Shoshone | 7/12 |
| Market Street | N/S Villanova Drive | E/S Kietzke Lane | 7/12 |
| Yale Way | E/S Harvard Way | W/S Market Street | 7/12 |
| Louise Street | N/S Market Street | S/S Mill Street | 7/12 |
| Automotive Way | E/S Kietzke Lane | W/S Market Street | 7/13 |
| Bible Way | N/S Vassar Street | S/S Mill Street | 7/13 |
| Condor Way | E End of Street | W/S Airmotive Way | 7/13 |
| Telegraph Street | N/S Vassar Street | S/S Greg Street | 7/14 |
| Matley Lane | N/S Vassar Street | S/S Mill Street | 7/14 |
| Marietta Way | End of Pavement | Greg Street | 7/15 |
| Glen Carran Circle | S Stanford Way (S) | S Stanford Way (N) | 7/15 |
| S Stanford Way | Nugget Avenue | Railroad | 7/15 |
| Pacific Avenue | S 21st Street | S 19th Street | 7/19 |
| S 21st Street | Greg Street | Pacific Avenue | 7/19 |
Thermoplastic
| STREET | FROM | TO | DATE |
| 7th Street | E/S Robb Drive | W/S Keystone Avenue | 7/13 – 7/15 |
| Sierra Center Parkway | E/S Virginia Street | N/S Maestro Drive | 7/15 |
| Bluestone Drive | N/S Huffaker Lane | N End Pavement | 7/15 |
| Sky Mountain Drive | N/S Summit Ridge Drive | Highland Ditch | 7/15 – 7/16 |
| Campus Way | N/S Sierra Center Parkway | S/S Neil Road | 7/16 |
| Maestro Drive | W/S Colbert Drive | W/S Longley Lane | 7/16 |
| Maestro Drive | E/S Longley Lane | SW/S Double R Boulevard | 7/16 |
| Sky Valley Drive | N/S Summit Ridge Drive | Highland Ditch | 7/15 – 7/17 |
| Tanberg Drive | N 7th Avenue | N Mineral Avenue | 7/17 |
| Clasen Court | N/E Ingenuity Avenue | N/E Ingenuity Avenue | 7/17 |
| Valley Road | N/S Freeway Overpass | S/S Enterprise Way | 7/17 |
Crack Sealing (Night Work 7:00 p.m. – 7:00 a.m.)
| STREET | FROM | TO | DATE |
| Mill Street | End of Terminal Way | W/S McCarran Boulevard | 7/12 – 7/16 |
| Peckham Lane | E/S Virginia Street | End of Longley Lane | 7/12 – 7/16 |
| State Street | E/S Virginia Street | W/S Holcomb Avenue | 7/12 – 7/16 |
| 3rd Street | W/S Sierra Street | E/S Vine Street | 7/12 – 7/16 |
| 4th Street | E/S Virginia Street | W/S Evans Avenue | 7/12 – 7/16 |
| Sutro Street | S/S Commercial Row | S/S 4th Street | 7/12 – 7/16 |
| Victorian Avenue | E Prater Way | E El Rancho Boulevard | 7/12 – 7/16 |
| El Rancho Boulevard | N/E Victorian Avenue | S/E Prater Way | 7/12 – 7/16 |
| El Rancho Boulevard | N/E Greenbrae Drive | S/E Wedekind Road | 7/12 – 7/16 |
| El Rancho Boulevard | McCarran Boulevard | S/E Sullivan Lane | 7/12 – 7/16 |
| North Hills Boulevard | N/S Golden Valley Road | S Buck Drive | 7/12 – 7/16 |
| Bridge Street | N of S Verdi Road | S 3rd Street (US 40) | 7/12 – 7/16 |
BUCK DRIVE ROADWAY IMPROVEMENTS PROJECT
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
Work Description
This project will be completed in multiple phases. The next phase will implement final striping. The new signal at North Hills Boulevard and Buck Drive will be installed later this fall.
Traffic Impacts
- Traffic control will be in place with modified travel patterns.
- Utilize U-turns for business access.
Additional Information
- Construction activities may impact bus routes and commute times.
- Traffic control will be adjusted as feasible to reduce peak hour impacts.
EAGLE CANYON SAFETY AND OPERATIONS PROJECT
RTC Project Manager, LaShonn Ford, P.E. – (775) 332-2136
Work Description
Concrete work at Richard Springs Boulevard and at the Eagle Canyon Park entrance is underway. Site preparation and grading are also underway for construction of the shared-use path from Calle De La Plata to Alena Way.
Traffic Impacts
Working hours are between 7:00 a.m. and 7:00 p.m.
- On Eagle Canyon Drive expect shoulder closures and/or lane shifts in both directions from Eagle Canyon Park to Calle De La Plata. This closure includes the bicycle lane, so please remember to use caution and share the road with bicycles.
- Travel lanes on Eagle Canyon Drive will be reduced to a single lane in each direction at Richard Springs Boulevard.
- Truckee Meadows Water Authority has a concurrent project on Goldeneye Parkway that may cause additional impacts. This may include lane shifts or flagger control on Eagle Canyon Drive. Access to Goldeneye Parkway may be closed from Eagle Canyon Drive. Please use caution in the area.
LA POSADA REHABILITATION PROJECT
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
Work Description
Roadway rehabilitation work is underway on La Posada Drive and Cordoba Boulevard. Motorists should expect lane reductions, temporary traffic control, and periodic detours during paving operations.
- La Posada Drive between Pyramid Way and Cordoba Boulevard will be reduced to one lane in each direction during construction activities. Short-duration full closures and detours may be implemented during paving operations.
- Cordoba Boulevard between La Posada Drive and Calle De Oro Parkway may experience lane closures and intersection detours during roadway rehabilitation work.
Please use caution when traveling through the work zone and follow all posted traffic control devices.
MILITARY ROAD CAPACITY AND SAFETY PROJECT
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Traffic will be shifted on Military Road to allow for two-way traffic with one lane in each direction.
MILL STREET CAPACITY & SAFETY PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Lane Closures
Construction is substantially complete, but single lane closures may occur on Mill Street from Yori Way to Terminal Way with left turn lanes at all signalized intersections. Closures on Kietzke Lane in the vicinity may also take place.
Visit MillStreetWidening.com for information and updates.
PRATER WAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Lane Closures
On Prater Way from Pyramid Way to Stanford Way, lanes will be reduced to 1 lane in each direction 24/7.
SPARKS BOULEVARD CAPACITY IMPROVEMENT PROJECT – NORTH PHASE
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Construction will continue through June 2027. Project limits are from the intersection of Sparks Boulevard/I-80 westbound ramps to the intersection of Sparks Boulevard/Shadow Lane.
The community is encouraged to stay informed about the project by accessing the project website (www.sparksblvdproject.com) or by texting “Sparks” to 866-540-8466.
Construction operations will mostly take place from 5:00 a.m. – 2:00 p.m. in the northbound direction and 9:00 a.m. – 7:00 p.m. in the southbound direction, Monday through Friday. Nighttime work and marathon weekend work are anticipated, with traffic control updates communicated in advance of this work.
July 12 – July 17
The community can expect the following traffic control:
Northbound and Southbound Long-Term Closure (24/7 thru June 2026)
24/7 single lane closure Sparks Boulevard between Prater Way and the Baring Boulevard Intersection in the northbound direction. Closure in effect through July 2026.
24/7 single lane closure Sparks Boulevard between Shadow Lane and Prater Way Intersections in the southbound direction. Closure in effect through July 2026.
Southbound (9:00 a.m. – 7:00 p.m. Monday – Friday)
Single lane closure on Sparks Boulevard from Prater Way to I-80.
Northbound (5:00 a.m. – 2:00 p.m. Monday – Friday)
Single lane closure on Sparks Boulevard from Lincoln Way to Prater Way
Howard Drive Detour:
Howard Drive closed at Sparks Boulevard. A detour is available via Fargo Way to O’Callaghan Drive.
SPARKS BOULEVARD/ION DRIVE TRAFFIC SIGNAL PROJECT
RTC Project Manager, LaShonn Ford, P.E. – (775) 332-2136
Construction will begin on July 13. Please note, working hours for the project have changed to 7:00 a.m. – 5:00 p.m.
Beginning July 13, there will be a 24/7 closure of the inside travel lane in both directions as crews begin work on the center median. This closure is anticipated to last approximately 2 weeks. Please plan accordingly and use caution in the area.
TRAFFIC SIGNAL MODIFICATIONS 25-01 PROJECT
RTC Project Manager, LaShonn Ford, P.E. – (775) 332-2136
The project is substantially complete. Crews will be completing remaining items through July.
VIRGINIA LINE BRT IMPROVEMENTS PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Lane Closures
Construction has begun from Sunday nights to Friday mornings from 7:00 p.m. to 7:00 a.m. Lanes on S. Virginia Street will be reduced to one lane in each direction from Moana Lane to Hubbard Way.
Daytime work at the northbound and southbound Bus Rapid Transit stations at Peckham Lane and at McCarran Boulevard will occur. Two lanes in each direction will remain open on Virginia Street, but lanes may be shifted. Please use caution.
Gentry Way Intersection
Through traffic on Gentry Way at Virginia Street may be detoured from 7:00 p.m. to 7:00 a.m.
WEST FOURTH STREET DOWNTOWN (WEST STREET TO VINE STREET) PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Project is substantially complete.
WEST FOURTH STREET SAFTEY (VINE STREET TO MCCARRAN BOULEVARD) PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Traffic has been shifted to the southside of Fourth Street, with two–way traffic in one lane each direction in the four lane areas. The signals at Stoker Avenue have been removed and there is now three-way stop sign control at Stoker Avenue as well as Summit Ridge Drive. The north side of the roadway will be a work zone throughout the corridor. In the two–lane area west of Summit Ridge Drive, traffic will be primarily two-way, with occasions of flagger control when work encroaches on the westbound lane. Work is progressing throughout the corridor. Please slow down so everyone goes home safe!
WHITE FIR STREET REHABILITATION PROJECT
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Traffic will be shifted on White Fir Street to allow for two-way traffic with one lane in each direction.