2026 PREVENTATIVE MAINTENANCE PROGRAM
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
Utility Adjustments (Day Work)
| STREET | FROM | TO | DATE |
| Veterans Parkway | Geiger Grade Road | Wind Walker Drive | 10/19-20 |
BIGGEST LITTLE BIKE NETWORK
RTC Project Manager, Sara Going, P.E. – (775) 335-1897
Work This Week
Crews will begin work on Sinclair Street between Liberty Street and Mill Street during daytime working hours. Residents and travelers should anticipate one-way traffic, partial intersection closures, and limited detours on Sinclair Street as crews install traffic calming and pedestrian safety features.
BUCK DRIVE ROADWAY IMPROVEMENTS PROJECT
RTC Project Manager, Bryan Byrne, P.E. – (775) 335-1865
Work This Week
This project will be completed in multiple phases. The next phase will implement final striping. The new signal at North Hills Boulevard and Buck Drive will be installed later this fall.
Traffic Impacts
- Traffic control will be in place with modified travel patterns.
- Utilize U-turns for business access.
BUS STOP IMPROVEMENTS 26-01 PROEJCT
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
Work This Week
RTC RIDE bus stop on southbound Robb Drive at McQueen High School has been relocated approximately 200 feet to the south near Lancer Street. The bus stop will be upgraded to include a shelter and ADA accessibility.
Traffic Impacts
No traffic impacts this week.
E. LINCOLN WAY ROUNDABOUTS PROJECT
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
Work This Week
Crews will be installing a new overhead sign structure on westbound E. Lincoln Way between Sparks Boulevard and Scheels Drive roundabout.
Traffic Impacts
Westbound E. Lincoln Way will be closed between Sparks Boulevard and the Scheels Drive Roundabout from 10:00 p.m. on October 20th to 6:00 a.m. on Ocotber 21st. Drivers should use caution and follow posted detours.
EAGLE CANYON SAFETY AND OPERATIONS PROJECT
RTC Project Manager, LaShonn Ford, P.E., P.T.O.E. – (775) 332-2136
The project is substantially complete. There may be intermittent closures as crews work to complete final items. On behalf of RTC, thank you for your patience throughout the course of construction.
GALLETTI WAY – KIETZKE LANE TO GLENDALE AVENUE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Work This Week
Work on this project is underway with one-way traffic operations from Kietzke Lane to Glendale Avenue. The contractor, Sierra Nevada Constuction (SNC), will be starting on the concrete and drainage work. A full closure of Galletti Way will begin on October 26th.
MILITARY ROAD CAPACITY AND SAFETY PROJECT
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Work This Week
Traffic will be shifted on Military Road to maintain for two-way traffic, with one lane in each direction. Drivers should follow posted signs and use caution in the area.
Public Information
The community is encouraged to stay informed about the project by accessing the project website: rtcwashoe.com/project/military-road-capacity-safety or by calling the Project Hoteline at (775) 235-2686.
PEMBROKE DRIVE CAPACITY AND SAFETY IMPROVEMENTS (MCCARRAN BOULEVARD TO VETERANS PARKWAY)
RTC Project Manager, Ashley Hurlbut, P.E. – (775) 335-1861
Work This Week
Earthwork on the north side of Pembroke Drive and the installation of the underground utilities and storm-drain infrastructure.
Traffic Impacts
The north-side roadway shoulder will be closed 24-hours a day and intermittenet lane closures may occur while crews install undergorund infrastucture across Pembroke Drive. Drivers should use caution and follow posted traffic-control devices.
PRATER WAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Work This Week
Crews have begun electric utility work on the south side of Prater Way in preparation for paving on this side.
Traffic Impacts
- Two-way traffic will be maintained on the north side of Prater Way.
- No street parking is allowed from Pyramid Way to Standford Way.
- Side streets and commercial drivewasy will remain acessible using temporary ramps, except for brief periods when construction equipment is active in the area.
PYRAMID HIGHWAY OPERATIONS IMPROVEMENTS
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
Project Information
Construction is anticipated to continue through Spring 2027. The project limits extend from ingenuity Avenue to Egyptian Drive.
Work This Week
During the week of October 19-23, work will include installing barrier rail on the west side of Pyramid Highway near the Calle de la Plata intersection, rip-rap and concrete improvements.
Traffic Impacts
Drivers and pedestrians shoudl follow posted detours and use caution throughout the work zone.
- Intermittent shoulder closures in both directions, throughout the project limits (Egyptian Drive to Ingenuity Avenue)
- At least one paved travel lane will remain open in each direction.
- Left turn lanes at all signalized intersections will remain open unless otherwise approved by the RTC.
- Short traffic delays may occur.
- Access will be maintained to adjacent properties,
- Temporary driveway closures may occur during certain construction activities; and if so, Q & D will provide notice to impacted properties 18-24 hours prior to start of work.
- Normal working hours are from 7:00 a.m. to 7:00 p.m., Monday – Friday.
- Q&D Construction will be working Saturday, October 17, 2026.
SPARKS BOULEVARD CAPACITY IMPROVEMENT PROJECT – NORTH PHASE
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Project Information
Construction will continue through June 2027. Project limits are from the intersection of Sparks Boulevard/I-80 westbound ramps to the intersection of Sparks Boulevard/Shadow Lane intersection.
Traffic Impacts
Construction operations will generally occur:
- Northbound: 5:00 a.m. – 2:00 p.m., Monday – Friday
- Southbound: 9:00 a.m. – 7:00 p.m., Monday – Friday
Nighttime work and work during special events may occur. Additional traffic control information will be provided in advance when applicable.
Work This Week
- 24/7 single-lane closure is anticipated on northbound Sparks Boulevard between Lincoln Way and Baring Boulevard intersection.
- 24/7 single-lane closure is anticipated on southbound Sparks Boulevard between Shadow Lane and Lincoln Way.
- Howard Drive is closed at Sparks Boulevard. Drivers should use Fargo Way and O’Callaghan Drive as the detour route.
Public Information
The community is encouraged to stay informed about the project by accessing the project website (www.sparksblvdproject.com) or by texting “Sparks” to 866-540-8466.
SPARKS BOULEVARD/ION DRIVE TRAFFIC SIGNAL PROJECT
RTC Project Manager, LaShonn Ford, P.E., P.T.O.E – (775) 332-2136
Work This Week
Concrete, paving, and striping work at the intersection is complete. Construction is temporarily paused while the project team waits for signal equipment to be delivered. We anticipate the project to be completed this fall.
TRAFFIC SIGNAL FIBER 26-01 PROJECT
RTC Project Manager, LaShonn Ford, P.E., P.T.O.E – (775) 332-2136
Work This Week
Trenching is complete. Current work for the project has no traffic impacts during this period.
VIRGINIA LINE BRT IMPROVEMENTS PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Work This Week
Construction will continue Sunday night through Friday morning from 7:00 p.m. to 7:00 a.m. South Virginia Street will be reduced to one-lane in each direction from Moana Lane to Hubbard Way. Through traffic on Gentry Way at South Virginia Street may be detoured between 7:00 p.m. – 7:00 am.
BRT Stations Impacts
- Southbound Station Closures: Mt. Rose, Orchard Plaza, McCarran Boulevard
- Northbound Station Closures: McCarran Boulevard, Center Street, Liberty Street
Closed stations are temporaily relocated for passenger pickup. Passengers should follow posted signs to the nearest available stop.
WEST FOURTH STREET SAFTEY (VINE STREET TO MCCARRAN BOULEVARD) PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Work This Week
There will be a full closure of Fourth Street between Vine Street and Keystone Avenue as the contractor completes roadway preparation for paving. This will be in place through October 29.
Traffic Impacts
Drivers should expect changing traffic patterns and increased construction activity throughout the corridor. Please slow down, follow posted signs, and use caution when traveling through work zone. Supporting local business in this corridor such as Mi Casa Too, Whispering Vine, and Johnny’s is highly recommended.
- Westbound: One-way traffic from Keystone Avenue to Stoker Avenue (detour at Stoker Avenue to Summit Ridge Drive)
- Eastbound: One-way traffic from McCarran Boulevard to Summit Ridge Drive
WHITE FIR STREET REHABILITATION PROJECT
RTC Project Manager, Austin McCoy, P.E. – (775) 335-1824
Work This Week
Traffic will be shifted on White Fir Street to allow for two-way traffic, with one lane in each direction. Please use caution in the area.